Прескочи към съдържанието
Връщане към търсене

Норвегия – Строителни и монтажни работи на вентилационни тръбопроводни инсталации – 77.25.XX Bodin Sixth form college ventilation such as building wing K

Sweco Norge AS (Hovedenhet)НорвегияПубликувано на 18.11.2026 г.
22 дни остават

Описание

Nordland County would like to carry out ventilation reconstruction for wing K at Bodinvideregående school Mørkved. Improvement of the ventilation installations at the school is the main assignment in the project. K302 Air treatment plant.Other contracts: K301 Plumbing, K401 Electro technical installations, K203 Construction Work. The school was built in 1984 and is divided in wings, from A to and including G. Fløy K was rebuilt in 2003. Planned start in wing K is at the end of the school year, summer 2027 approx. middle of June 27. The reconstruction area amounts to approx. 2,850 m2. Information on planned work that shall be carried out in summer 2027, weeks 24-32.

1st floor. wing K:

• Construction work, disassembly of existing ceilings, reassembly of ceilings as well as some new ceilings.

• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling for KNX - control of fire damper/heating/lighting. Cabling towards central processing system.

2nd floor wing K

• Ventilation, insertion on the existing ventilation channels for mounting of fire dampers VAV-damper for control of ventilation.

• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work in the floor.

• Electrical work, new lights with LED and Dali control are to be established, necessary cabling for KNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.

3 floor. wing K

• Ventilation, insertion on the existing ventilation channels for assembly of fire dampers VAV-damper for control of ventilation.

• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work.

• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling for KNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.

•Technical room 1 floor. Wing K, 2 aggregates are to be renovated and delivered with a new automation for control from the control system. Something is altered on the intake channel system 001. On all 3 aggregates, parts of the chassi internal cover shall be covered with new bottom plates. The joint intake for all aggregates is to be altered.

Кодове CPV

Ventilation installation workVentilation equipmentConstruction work

Документи и подаване

AI резюме
Влезте, за да получите AI резюме

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Свързани поръчки