Norway – Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork – Competition - Framework agreement for renovation no-dig, water pipelines including manholes.
Popis
The framework agreement is for the renovation of water pipelines and manholes when blocking out. Controlled drilling, pilot pipe drilling and hose renovation are not included in the framework agreement. The aim of the framework agreement is to cover the need for renovation of water pipelines, where blocking out can be used as a method, as well as renovation of manholes and re-connection of private service pipes. In addition to blocking out, there will be a limited need for renovation by using traditional trench excavation in cases where blocking out cannot be carried out. The contracting authority is planning for two call-offs per annum, with each call-off consisting of packing several measures. The contracting authority plans to renovate approx. 3,000 metres per annum and increase the number of metres during the contract period. The actual extent will vary, however, and the contracting authority is not obligated to the above mentioned estimate. In addition to planned measures, urgent orders may occur. The framework agreement ́s estimated financial framework, including an option for an extension, is NOK 415,000,000,-, while the maximum limit is NOK 600,000,000,-. This is based on a calculation of the estimated price of 3,000 metres per annum, which can be increased to 4,000 metres per annum. The framework agreement period is 2 + 1 + 1 + 1 + 1 years.
Kódy CPV
Dokumenty a podání
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Související zakázky
Norway – Floor laying and covering work – Industrial flooring work St. Olavs Hospital HF
SYKEHUSINNKJØP HFNorskoFloor laying and covering workFloor-covering workDeadline za 35 dnůPublikováno 06. 10. 2026
Norway – Glazing work – Framework Agreement for Glazing Services
Kristiansand kommuneNorskoGlazing workGlassInsulating glassDeadline za 33 dnůPublikováno 06. 10. 2026
Norway – Construction work – Sheltered accommodation flats
Nordreisa KommuneNorskoConstruction workWorks for complete or part construction and civil engineering workBuilding construction workDeadline za 35 dnůPublikováno 06. 10. 2026
Norway – Construction work – Framework agreement contractor services - Municipal engineering installations for Trondheim municipality.
Trondheim kommuneNorskoConstruction workSite preparation workLandscaping workDeadline za 19 dnůPublikováno 06. 10. 2026