Írország – Épületszerelési munka – Fire Remediation Works at Rowantree Court, Mullaghmonaghan, Monaghan
Popis
The project involves the execution of fire remediation works to an existing 24-unit residential development located at Rowantree Court, Mullaghmonaghan, Monaghan, on behalf of the client, Oaklee Housing. The objective of the works is to address identified fire safety deficiencies in order to bring the building into compliance with current fire protection and life safety standards outlined in TGD Part B (Fire Safety) of the Building Regulations and other relevant codes such as IS 3218:2913 for fire alarm systems. The scope of the remediation works includes, but is not limited to: • Installation of fire-stopping systems at service penetrations and wall/floor junctions. • Replacement or upgrade of fire-rated doors, closers, and seals to comply with TGD-B. • Retrofitting of cavity barriers at floor levels in external cavity. • Fire alarm cable rerouting and improvements to service risers and shafts. • Sealing of socket/switch boxes within fire-rated partitions. • General improvement of compartmentation and passive fire protection measures. All works will be undertaken within a live residential environment, requiring a high level of coordination to minimise disruption to residents.
Kódy CPV
Dokumenty a podání
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Související zakázky
Írország – Építési munkák – building extension project at Scoil Mhuire Agus Iosaf, Collooney, Co. Sligo.
Scoil Mhuire Agus IosafIrskoConstruction workPrimary school construction workDeadline za 31 dnůPublikováno 03. 9. 2026
Írország – Oktatással és kutatással kapcsolatos épületek kivitelezése – Proposed extension to existing school building including carpark and set down facilities, and all associated site development works at Scoil Naisiunta Mhuire Bainrioghan, Dunkerrin, Birr, Co. Offaly
Scoil Muire Bainrioghan (Dunkerrin NS)IrskoConstruction work for buildings relating to education and researchConstruction work for school buildingsPrimary school construction workDeadline za 26 dnůPublikováno 03. 9. 2026
Írország – Építési munkák – Curlew Road Helthcare Campus, Drimnagh, Dublin 12
Health Service Executive (HSE)IrskoConstruction workŽádná splatnost uvedenaPublikováno 03. 9. 2026
Írország – Magasépítési munka – The Design and Construction of the Clongriffin Lands Phase 2 (Zone 8, 9 and Creche), Dublin 13 (Pro426)
The Land Development AgencyIrskoBuilding construction workConstruction workMulti-dwelling buildings construction workŽádná splatnost uvedenaPublikováno 02. 9. 2026