Přeskočit na obsah
Zpět na vyhledávání

Německo – Instalace a montáž eskalátorů – Rahmenvertrag Fahrtreppen

DB InfraGO AG – Geschäftsbereich Personenbahnhöfe (Bukr 11)NěmeckoPublikováno 07. 7. 2026
Není uveden žádný deadline

Popis

Escalators, including their manufacture, delivery, installation, commissioning, including construction management, and the possible dismantling of old systems (contract duration 4 years with the option of termination by the contracting authority after two or three years) divided into two regional lots, Lot 1 North and Lot 2 South. Lot 1 North includes the regional areas of North, West and East. Lot 2 South includes the regional areas of Central, Southwest, South and Southeast. The framework contract prices are fixed. In particular, the following requirements must be taken into account: • Impairments due to the use of grit, sand, salt and cleaning water • Increased corrosion stress • Strong soiling by brake dust (rail traffic) • Penetration of body fluids (e.g. urine, especially in a reversing station) • Strong sunlight (e.g. UV light) • Extreme weather conditions (storm, hail, lightning strike, etc.) • High traffic volume • High duty cycle • Vandalism resistance

Kódy CPV

Escalator installation workEscalators

Dokumenty a podání

AI shrnutí
Přihlásit se pro AI shrnutí

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Související zakázky