Spring til indhold
Tilbage til søgning

North Macedonia – Pipeline-inspection services – Inspection of the natural gas transmission system Zhidilovo–Skopje and distribution pipeline Skopje South using the in-line method, and inspection of Deve Bair–Zhidilovo (0–4 km) and distribution pipelines Skopje North 1.8 km, Bunardzhik 5.4 km, Kumanovo 7.7 km, Kratovo 4.6 km and Kriva Palanka 1.5 km using NDT methods

Joint Stock Company for performing energy activity natural gas transmission NOMAGAS Skopje in state ownershipNordmakedonienPubliceret den 25. okt. 2026
27 dage tilbage

Beskrivelse

Services for inspection of the natural gas transmission system Zhidilovo–Skopje and the distribution pipeline Skopje South using in-line inspection (ILI), as well as inspection of the Deve Bair–Zhidilovo section (0–4 km) and the distribution pipelines Skopje North (1.8 km), Bunardzhik (5.4 km), Kumanovo (7.7 km), Kratovo (4.6 km) and Kriva Palanka (1.5 km) using non-destructive testing (NDT) methods, in accordance with the technical specification in the tender documentation.

CPV-koder

Pipeline-inspection services

Dokumenter & indsendelse

AI sammandrag
Log ind for et AI sammandrag

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Relaterede udbud