Germany – Installation of doors and windows and related components – Tischlerarbeiten - Innentüren DIN 18355
Description
- 18 Internal doors with steel frame and solid door leaf with HPL coating on both sides, to be installed in a drywall with a thickness of 12.5 cm, or a plywood wall with a facing shell with a thickness of 18.5 cm, or in a reinforced concrete wall with a thickness of 20 cm, single-leaf
- 34 Internal doors with steel frame, solid door leaf with HPL coating on both sides, single-leaf and double-leaf
- 3 Internal doors with steel reveal frame, solid door leaf with HPL coating on one side and on-site acoustic cladding, single-leaf, door with shell handle
Internal doors with partial increased sound insulation requirements and fire protection requirements, doors including stainless steel door furniture and finger trap protection
- 2 Fixed glazing window units
- 4 Window units with wooden frames made of spruce, fixed glazing, F30 and wooden reveal panel
- 3 Window units with steel frames, steel reveal panel and fixed glazing
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Joinery and carpentry installation work – Tischlerarbeiten Innentüren-WC Trennwände-Faltwand
Verwaltung GablenzGermanyJoinery and carpentry installation workDeadline in 35 daysPublished on Jul 27, 2026
Germany – Mechanical engineering installation works – 30 Krananlagen
Staatliches Bau- und Liegenschaftsamt Rostock, die Bundesrepublik Deutschland vertretendGermanyMechanical engineering installation worksCranes, mobile lifting frames and works trucks fitted with a craneDeadline in 34 daysPublished on Jul 27, 2026
Germany – Construction work for swimming pool – KKE 3317 Fassade BT 2+3 Bad 15
Berliner Bäder-Betriebe AöRGermanyConstruction work for swimming poolMiscellaneous special-trade construction workFacade workDeadline in 13 daysPublished on Jul 27, 2026
Germany – Flatwork – OB_BAU_GA+PSS Grauhof-Goslar
DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)GermanyFlatworkDeadline in 34 daysPublished on Jul 27, 2026