Romania – Construction work for electricity power lines – Modernizare posturi de transformare - lucrare "la cheie" elaborare documentatie tehnico-economica faza PTh+CS+DTAC+DDE, furnizare produse (exclusiv contoare, care vor fi puse la dispozitie de Delgaz Grid) și execuție lucrări necesare pentru atingerea obiectivelor proiectului, întocmire documentație As Built - Proiect de Interes Comun de Modernizare a rețelei de energie electrică - CARMEN
Description
The subject of the procurement is the turnkey delivery of the work "Modernisation of transformer stations" - PTA 3 BUCURESTI, PTA 1 BUDA, PT 2 RAZBOIENI, PT 276 PIATRA NEAMT, PT 1 MOARA, PT 2 POCHIDIA SAT, PT 4 TRESTIANA, PT 2 BOGDAN VODA TV, PT 5 SUCEVITA, PT 56 CAMPULUNG, PT 1 GRIVITA SAT, respectively the preparation of technical and economic documentation phase PTh+CS+DTAC+DDE, supply of products (excluding meters, which will be provided by Delgaz Grid) and execution of works necessary to achieve the project objectives, preparation of As Built documentation, consisting of the following activities, exemplified in project no. 182/2024 - phase SF (made available to economic operators for guidance): Design activities: • preparation of documentation for obtaining opinions, agreements, authorisations, Building Permit and support for obtaining it; • preparation of technical documentation (technical design – (PTH), bill of quantities (CS), execution details (DDE) - detailed execution documentation including other necessary expertise for the preparation of the technical design– having as an example but not limited to these, the techno-economic scenarios established in the design documentation phase SF) • technical assistance during the execution of the works • technical assistance for the participation of the designer in the phases included in the execution works control programme, approved by the I.S.C. Execution of works: • acquisition of all materials and equipment necessary for the execution of the works; • execution of the works, with the integration of the necessary materials and equipment; • testing and commissioning (PIF); • training (schooling) of the operating personnel of the contracting entity; • preparation of As Built documentation (technical documentation prepared in accordance with the actual situation on site upon completion of the works); • preparation of documents necessary for the completion of the technical file of the investment. Note: *) The costs related to the training (schooling) of Delgaz Grid SA personnel are included in the cost of the equipment (Chapter 4.4 of the bill of quantities). **) The costs of the fees for obtaining opinions, agreements and authorisations will not be included in the offer, the payment of these being made on the basis of supporting documents. Number of days by which clarifications can be requested before the deadline for submission of tenders: 18 days. Ent.ctr. will respond to clarification requests/information requests, in accordance with art 172 para. (2) of Law 99/2016. The response of Ent.ctr. to these requests will be transmitted 11 days before the deadline set for the submission of tenders cf art 173 of Law 99/2016. Ent. Contr. is not obliged to respond to clarification requests received after the specified deadline. All responses to the requested clarifications will be available to any interested Op.ec. by accessing the section "LIST OF CLARIFICATIONS, NOTIFICATIONS AND DECISIONS" from the Participation Notice associated with this procedure through SEAP, using the interface: http://sicap-prod.e-licitatie.ro/pub. If necessary, Ent.Ctr. may modify the content of the Award Documentation by issuing an Amendment to the Award Documentation. Modifications may be issued at any time before the deadline for receipt of Tenders, but Ent. Ctr. will, if necessary, allow a sufficient time interval for interested Op.ec. to prepare Tenders, by extending the deadline for receipt of Tenders.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Romania – District-heating mains construction work – Proiectarea și execuția lucrărilor pentru obiectivul de investiții: Reabilitare rețele secundare de termoficare la PT 108, PT 209, PT 210, PT 215, PT 521, PT 523 si PT 868
MUNICIPIUL ORADEARomaniaDistrict-heating mains construction workHeating equipmentCentral-heating installation workDeadline in 35 daysPublished on Aug 02, 2026
Romania – Construction work – Lucrări de intervenții în vederea conformării la cerințele securitații la incendiu la Spitalul Clinic de Recuperare din Cluj-Napoca pentru proiectul „Investiții în infrastructura Spitalului Clinic de Recuperare Cluj-Napoca”
JUDETUL CLUJ (CONSILIUL JUDETEAN)RomaniaConstruction workDeadline in 15 daysPublished on Aug 02, 2026
Romania – Electrical installation work of pumping equipment – Modernizare statii de pompe din spatele digurilor din cadrul SH. Rm. Vâlcea: „SP Topolog de la CHE Babeni, SP Bratia de la CHE Babeni, SP Bistrita de la CHE Babeni, SP Olanu de la CHE Ionesti, SP Oltet de la CHE Ipotesti, SP Poganu de la CHE Strejesti, SP Teslui de la CHE Arcesti, SP Teslui – Farcasele de la CHE Draganesti”
SPEEH HIDROELECTRICA SARomaniaElectrical installation work of pumping equipmentElectricity distribution and control apparatusWater pumpsDeadline in 35 daysPublished on Aug 02, 2026
Romania – Overhaul and refurbishment work – Executia lucrarilor pentru obiectivul de investitii „Creșterea eficientei energetice a clădirii publice – Corp A, din cadrul Liceului Tehnologic Agricol "Alexandru Borza", oraș Geoagiu, jud. Hunedoara” COD SMIS 351837
Orasul Geoagiu (Primaria)RomaniaOverhaul and refurbishment workElectrical installation workThermal insulation workDeadline in 9 daysPublished on Aug 02, 2026