Volver a la búsqueda
Írország – Középiskola építése – Contractor for Additional Accommodation Reconfiguration and In-Fill Works to provide 1x Art Room, 1x Woodwork room and preparation area to Presentation Secondary School, Ballyphehane, Cork.
Presentation Secondary School (Ballyphehane)IrlandaPublicado el 02 ago 2026
21 días restantesDescripción
The proposed development consists of Reconfiguration Works to provide •1 No. Conversion of Existing Home Economics Room in to Art Room (96.5m²), •1 No. Conversion of Existing Art Room in to Wood Technology Room (99.5m²), •In-Fill construction providing a Wood Machining and Preparation Room of 30m² area. The proposed reconfiguration layouts make the maximum use of the existing available space within the existing classrooms and the additional in-fill Wood Machining and Preparation Room slots within the existing footprint of the building.
Códigos CPV
Secondary school construction workConstruction work for school buildingsWorkshops construction workBuilding construction work
Documentos y presentación
Resumen de IA
Inicia sesión para un resumen de IAContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Licitaciones relacionadas
Írország – Elemi iskola építése – Extension to St. Clare's National School Ballyjamesduff
BT-500-St. Clare's National School BallyjamesduffIrlandaPrimary school construction workVencimiento en 18 díasPublicado el 02 ago 2026
Írország – Iskolaépületek kivitelezése – Remedial Works to section of roof
St. Michael's National School (Borris)IrlandaConstruction work for school buildingsVencimiento en 25 díasPublicado el 02 ago 2026
Írország – Elemi iskola építése – Two Storey Extension with SEN Base to Esker ETNS Lucan with Associated Siteworks and temporary accommodation
Esker ETNSIrlandaPrimary school construction workVencimiento en 36 díasPublicado el 02 ago 2026
Írország – Elemi iskola építése – Fenor National School (Co. Waterford)
Fenor National SchoolIrlandaPrimary school construction workConstruction work for school buildingsBuilding extension workVencimiento en 25 díasPublicado el 02 ago 2026