Sisu vaatamiseks vahele jätta
Tagasi otsingule
See leping on tagasi võetud.

Madalmaad – Ehitustööd – 15118 | Realisatie Masterplan Rijkskantoor Westraven te Utrecht

RijksvastgoedbedrijfHollandAvaldatud 10. sept 2026
Tähtaja ei antud

Kirjeldus

Maastriplan Westraveni raames on the basis of a UAV specification, the Rijkskantoor, used by Rijkswaterstaat, will be renovated in phases. The core of the task is the integral reorganization and optimization of the work environment. Both the logistics, the workplace mix and the spatial layout. In this context, the supporting facilities such as the catering facilities, meeting, presentation and meeting rooms are made both qualitatively and quantitatively sufficient. This European non-open procedure is a retender. In October 2025, this project assignment was already published via a competitive dialogue through TenderNed (see reference 546767) and withdrawn in June 2026. To gain insight into the (concept) contract documents with accompanying documents, it is possible to consult the documents of the closed tender via TenderNed by searching for reference “546767” or searching for “15118 | Realisatie Masterplan Rijkswaterstaat Westraven te Utrecht”. The assignment consists of the phased realization and coordination of the entire work in main contract. Overview general characteristics Area: - current: approximately 53,700 m2 gfa - after assignment: approximately 55,000 m2 gfa Layout: - high-rise 23 floors (excluding basement and roof construction) - low-rise: 5 wings each with 4 floors (excluding roof construction) Disciplines: construction costs, interior construction, (mechanical) engineering, building physics, circularity, indoor landscaping, sustainability, security, fire safety, construction, installation technology (electricity and ICT), quality assurance, system engineering, safety & health, climate technology. Special feature: during the works, the maintenance of the operational parts of the Westraven complex falls under the responsibility of the contracted maintenance contractors. During the realization, coordination is necessary for temporary situations, (partial) use and (impact of) major works. A guideline price is used, which is based on a carefully prepared estimate prior to the tender, including market prices. This guideline price will be communicated to the selected candidates during the registration phase.

CPV koodid

Construction workSurveillance and security systems and devicesCooling and ventilation equipmentKitchen or restaurant conversionBuilding installation workInterior gardensConstruction management services

Dokumendid & esitamine

AI kokkuvõte
Logi sisse AI kokkuvõtte jaoks

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Seotud hanked