Saksamaa – Metallkonstruktsioonide paigaldus – Kläranlage Aurich-Haxtum, Bau Faulung II - Stahlbau

Stadt AurichSaksamaaAvaldatud 09. aug 2026
Tähtaja möödunud

Kirjeldus

Ausschreibungsinhalt on the construction of a new sludge digester at the Aurich-Haxtum wastewater treatment plant. The Aurich-Haxtum wastewater treatment plant treats the wastewater of the city of Aurich and the surrounding villages. In addition to the predominantly municipal wastewater, dairy wastewater from the local dairy Rücker is also treated at the Aurich wastewater treatment plant. The current inflow load is approximately 68,500 EWCSB. A sludge digestion plant has been operated at the wastewater treatment plant since 1963 to stabilise and reduce the primary sludge produced during wastewater treatment. Despite ongoing optimisations and renovations, the sludge digestion has reached its performance limit due to increased inflow loads. The existing digestion capacity is only limited for the primary sludge and the flotation sludge produced during the pretreatment of the dairy wastewater. The digestion process is sometimes overloaded and leads to difficult operating conditions. During maintenance and repair work on the digester (approx. 60 years old), there are currently no reserve capacities available. It is currently not possible to use the excess sludge (ÜS) energetically, as the digester with a digestion time of far less than 20 days is already overloaded. All ÜS sludge is therefore stabilised in a composting plant. The operation of the sludge composting requires a lot of space, leads to high sludge disposal costs and is generally uneconomic. In the long term, the operation of the composting plant is to be discontinued and the ÜS sludge is to be used energetically and for sludge reduction in a sludge digestion plant. For this reason, the construction of a sludge digester for the ÜS sludge is necessary. This includes the following measures:

- Construction of a new digester for ÜS sludge including operating building

- Erection of a new gas storage and emergency flare

- Installation of a new CHP plant and digester gas purification

- (Installation of a sludge disintegration; planned later)

- (Installation of a reception station for fats and co-substrates; planned later)

- Integration of the new construction measure into the existing plant and control technology

The Aurich wastewater treatment plant is located in Haxtum. Address: Kläranlage Aurich Haxtum Zum Antjebitt 1 26605 Aurich

Scope of services of the contract unit

The essential scope of services of the contract unit is listed below for each specialist trade.

- Trade 1 Earthworks (already commissioned)

- Trade 2 Earthworks

- Trade 3 Civil engineering

- Trade 4 Steel construction

- Trade 5 Roofing work

- Trade 6 Façade construction

- Trade 7 Door/window construction

- Trade 8 Plastering work

- Trade 9 Screed work

- Trade 10 Tiling work

- Trade 11 Painting work

- Trade 12 Mechanical engineering

- Trade 13 EMSR technology

- Trade 14 CHP technology

- Trade 15 Dismantling and demolition of the former gas flare plant

CPV koodid

Installation of metal structuresScaffolding workInstallation of metal joinery except doors and windows