Rootsi – Ehitustööd – Anläggningsentreprenad NFVP-BE01.
Kirjeldus
Upphandling on the installation of a construction contract that will be carried out in connection with the existing waterworks, Görvälnverket, in full operation. The contract almost exclusively covers the implementation of site-cast concrete structures with high requirements for watertightness and control of materials that will be in future contact with drinking water. A high occurrence of implementations in watertight structures, some prefabricated and pipe installations may occur. The contract includes work with high pool walls and some parts of hardening class 4, which requires good planning. The estimated concrete volume is approximately 9,300 m³, of which approximately 60% are watertight structures/pools. In parallel with this contract, subcontracts will be carried out, which will involve extensive coordination. The contract will be signed with one (1) contractor. This invitation to tender concerns step 1. A more detailed scope will be apparent from the material sent out in step 2.
CPV koodid
Dokumendid & esitamine
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Seotud hanked
Sverige – Anläggningsarbete – Dynamiskt inköpssystem för anläggningsarbeten avseende våtmarker
Statens fastighetsverkRootsiConstruction workDrainage construction worksConstruction work for water projectsAegumiskuupäeva ei antudAvaldatud 19. nov 2026
Sverige – Skyddsrum – Dynamiskt inköpssystem Skyddsrumsåtgärder
HBVRootsiProtective sheltersSpecial trade construction works other than roof worksMiscellaneous special-trade construction workAegumiskuupäeva ei antudAvaldatud 19. nov 2026
Sverige – Anläggningsarbete – Upphandling av entreprenadmaskiner inkl förare
RAMBO ABRootsiConstruction workHire of construction and civil engineering machinery and equipment with operatorHire of trucks with driverTähtajaks on 31 päevaAvaldatud 19. nov 2026
Sverige – Anläggningsarbete – Ny mottagningsstation och reservkraftsanläggning USÖ
Region Örebro LänRootsiConstruction workTähtajaks on 32 päevaAvaldatud 18. nov 2026