Netherlands – Distribution transformers – Compact stations
Kirjeldus
In order for Gasunie to achieve the intended result of the contract (see section 2.1.1), you shall be required to perform various activities, also referred to as the ‘contract scope’. These activities are, in general terms, outlined below: • Engineering, manufacturing, assembly, testing (FAT), transportation to Gasunie site and testing on site (SAT) of compact stations. • Each compact station contains: o Concrete housing. o One hermetically sealed oil type 400 kVA 33kV/0,41 kV transformer. o One low voltage distribution board. o One socket outlet rack on the outside of the compact station. • Engineering, manufacturing, assembly, testing (FAT), transportation and testing on site (SAT) of one walkable enclosure: o Steel housing/container (to contain a dry type 6.3MVA 33kV/20kV transformer the transformer will be supplied by Gasunie). o 20 kV switchgear including 1 incoming and 2 outgoing feeders. • FAT at supplier’s factory. • SAT including testing on site and commissioning support. See award guideline.
CPV koodid
Dokumendid & esitamine
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Seotud hanked
Nederland – Elektronische benodigdheden – Project TPS Zeeland - Levering Frequentieomvormers
Evides N.V.HollandElectronic suppliesDrinking-water treatment plant construction workTähtajaks on 36 päevaAvaldatud 12. okt 2026
Nederland – Accumulatoren, primaire cellen en primaire elementen – BESS met lokaal Edge EMS ten behoeve van netcongestie
Waterschap Rijn en IJsselHollandAccumulators, primary cells and primary batteriesBatteriesAutomation systemTähtajaks on 52 päevaAvaldatud 08. okt 2026
Nederland – Distributie- en regelinstallaties voor elektriciteit – Laagspanning Verdeelkasten
Enexis Netbeheer BV/Enexis Personeel BVHollandElectricity distribution and control apparatusAegumiskuupäeva ei antudAvaldatud 01. okt 2026
Nederland – Middenspanningsuitrusting – Ontwerp en realisatie van twee 10kV inkoopstations in Westerhoven en Helmond
Provincie Noord-BrabantHollandMedium-voltage equipmentMedium-voltage installation workTähtajaks on 3 päevaAvaldatud 30. sept 2026