An Ghearmáin – Heating, ventilation and air-conditioning installation work – GMH - Heizung, Lüftung, Sanitär
Cur síos
RVK is a transport company whose core transport area covers the district of Euskirchen, the Rheinisch-Bergischer Kreis and the left-bank Rhein-Sieg-Kreis. The provision of services is carried out on its own lines as well as on behalf of other transport companies. The RVK intends to construct a depot for hydrogen fuel cell and battery-electric buses as part of the construction project. The approximately 13,500 m² construction site is located in Bensberg, a suburb of the city of Bergisch-Gladbach. The area is located east of the L195 Friedrich-Ebert-Straße and west of the Straße Steinhaus. The contracting authority, Regionalverkehr Köln GmbH, intends to shortly tender the contract package "Heating, Ventilation, Sanitary" for this construction project. The following are to be created on the site: a support structure with a hydrogen production plant, an office and administrative building with a car park and inspection hall, 3 bus canopies, a portal washing system for buses and the associated traffic areas. The buildings of the depot extend over approximately 5,300 m² of land, have a gross floor area of approximately 11,500 m² and a gross volume of approximately 39,950 m³. The contract package includes the technical completion in respect of the trades of heating, ventilation and sanitary for all buildings and the infrastructure. The heat supply to the property is essentially provided by the waste heat of the electrolyser, which can be decoupled via a heat exchanger and made available. In addition to heating the enclosed buildings, the frost protection of the access ramps for buses and cars is also planned. The sanitary installations focus mainly on the inspection hall, the office and administrative building, the portal washing system and the supply of the electrolysers for hydrogen production. A small sanitary unit is planned in the office and administrative building. The construction of the portal washing system is not part of the contract package. The ventilation of the rooms with charging and switching systems is carried out passively by means of intake and exhaust openings, which are assisted by fans depending on the temperature. In the outdoor area on the roof above the administrative rooms, a central ventilation and air conditioning unit in a weatherproof design with HRU, pre-tempering of the supply air by heating and cooling registers according to the season, via which all rooms of the administrative level are supplied and exhausted. The main services are: a) Gas, water and drainage systems b) Heating systems and central water heating systems c) Ventilation systems d) Building automation e) Insulation and fire protection work on technical systems.
Códanna CPV
Dátaí & iontráil
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Tairiscintí gaolmhara
Deutschland – Abdichtungs- und Dämmarbeiten – GS Ost - Sanierung im Bestand - Wärmedämmung und Brandschutz
Gebäudemanagementbetrieb der Landeshauptstadt Saarbrücken - GMSan GhearmáinInsulation workFireproofing workThermal insulation workDéadlín i 30 láFoilsithe ar 19 Samh 2026
Deutschland – Landschaftsgärtnerische Bauleistungen für Grünanlagen – Samtgemeinde Lüchow (Wendland) - Neubau Grundschule in Wustrow_Los 21 Freianlagen
Samtgemeinde Lüchow (Wendland)an GhearmáinLandscaping work for green areasDéadlín i 53 láFoilsithe ar 19 Samh 2026
Deutschland – Installation von Elektroanlagen – Los 20a ELT Starkstrom REGSGH
Landkreis Mansfeld-Südharzan GhearmáinElectrical wiring and fitting workDéadlín i 30 láFoilsithe ar 19 Samh 2026
Deutschland – Boden- und Fliesenarbeiten – Umbau und Erweiterung der Katharinengrundschule in Straelen - Fliesenarbeiten Jahrgangsstufenhaus und Verwaltungsanbau
Stadt Straelenan GhearmáinTiling workDéadlín i 53 láFoilsithe ar 19 Samh 2026