Séim le haghaidh an ábhar
Ar ais go lorg

An Ísiltír – Bridge construction work – Bouwteam kunstwerken fase 4 en 5 Nobelhorst te Almere Hout

Gemeente Almerean ÍsiltírFoilsithe ar 19 Ean 2026
Níl deireadh aon áit

Cur síos

Realisation in a construction team arrangement by means of a framework agreement of a maximum of 47 steel and concrete bridges in the area of Nobelhorst phase 4 and 5 in Almere Hout. Maximum 47 steel and concrete bridges

Códanna CPV

Bridge construction work

Dátaí & iontráil

Coimriú AI
Logáil isteach don saorán AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Tairiscintí gaolmhara