Séim le haghaidh an ábhar
Ar ais go lorg

An Ghearmáin – Construction work for airfields, runways and manoeuvring surfaces – Erneuerung Taxiway Foxtrot (TWY F) - Verkehrsanlagen und Ingenieurbauwerke

Flughafen Nürnberg GmbHan GhearmáinFoilsithe ar 20 Aib 2026
Níl deireadh aon áit

Cur síos

Airport Nürnberg GmbH is planning the renewal and widening of Taxiway Foxtrot (TWY F) for future regular use by aircraft in accordance with EASA Code E. The comprehensive renewal includes widening the taxiway in straight sections from 22.5 m to 23 m. The new asphalt surface to be created comprises approximately 44,500 m². The measure includes the comprehensive renewal of the surfaces, drainage systems and cable ducts, the construction of a new demand taxiway T1 and the fillet widenings in the area of the taxiways TWY J and TWY F / C. The construction work is to be carried out in defined construction phases with interruptions. Construction phase I = construction year 2027 and construction phase II = construction year 2028. Construction phase I includes the western part of TWY F - Station 0+550 to 1+450. Construction phase II includes the eastern part of TWY F - Station 0+000 to 0+550. Work in the section 1+420 to 1+450 (Zone A according to NfL I 191/99) must be carried out during specified night closures in 2027. The TWY T1 will be used as a demand taxiway during the construction work in 2028 and must be created in construction phase BP-I in 2027. After the section-by-section dismantling of the existing structure of the operational surface TWY F, qualified ground improvements must be carried out at ground level. Thereafter, the entire superstructure will be rebuilt according to the standard structure. Both in construction phase BP-I and in construction phase BP-II, operational interim states must be ensured, with pre-operational commissioning of the relevant taxiway relationships (TWY F - TWY E and TWY J). In the area west of TWY E, the drainage systems will be supplemented, i.e. in the section between the stations 0+940 and 1+170 a new drainage channel will be created and connected to the existing system. Furthermore, a new drainage system will be constructed north of TWY F in the area between TWY D and TWY E.

Códanna CPV

Construction work for airfields, runways and manoeuvring surfaces

Dátaí & iontráil

Coimriú AI
Logáil isteach don saorán AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Tairiscintí gaolmhara