Norway – Construction work for bridges and tunnels, shafts and subways – Bridge maintenance Telemark 2027-2028
Cur síos
The nature and scope of the work The assignment includes maintenance work on bridges in Telemark county. The work shall be carried out on 13 fixed bridges. The contract also includes process based work under Bridge 50. The contract will be valid from when the contract is signed until 31.12.2028, with an option for an extension for up to 2 x 12 months. More information can be found in the attached tender documentation. If there is discrepancy between the information in Hyyr and the attached tender documentation (chapter A-E including annex), the attached tender documentation ranks before the other information in Hyyr. Tender conference A tender conference will be held: 23.11.2026, kl. 09.00, i Torggata 18, 3717 Skien, meeting room Bandak 3rd floor.
Códanna CPV
Dátaí & iontráil
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Tairiscintí gaolmhara
Norway – Airport buildings construction work – Competition - C06866 - 241012 - Design and Build Contract - NAWSARH Stanghaugen Bodø
Forsvarsbyggan IoruaAirport buildings construction workSite preparation workSite preparation and clearance workDéadlín i 34 láFoilsithe ar 11 Samh 2026
Norway – Construction work – 2026/5388 - 1148703 NTNU Campussamling - Sub-project 1148712 P6 HUMSAM - K206 - Partnering Contract
Statsbyggan IoruaConstruction workBuilding demolition and wrecking work and earthmoving workSite preparation workNíl deireadh ar leithFoilsithe ar 11 Samh 2026
Norway – Construction work – 2027 Framework agreement Emergency excavation preparedness water and sewage.
Trondheim kommunean IoruaConstruction workSite preparation workDemolition, site preparation and clearance workDéadlín i 29 láFoilsithe ar 11 Samh 2026
Norway – Construction work for water and sewage pipelines – The centre of Tjøme - stage 3
Færder kommunean IoruaConstruction work for water and sewage pipelinesDrains construction workConstruction work for sewage pipesNíl deireadh ar leithFoilsithe ar 09 Samh 2026