Séim le haghaidh an ábhar
Ar ais go lorg

An Ghearmáin – Construction work for swimming pool – Edelstahlbecken

Landeshauptstadt Hannover - Fachbereich Gebäudemanagementan GhearmáinFoilsithe ar 05 Samh 2026
18 lá fágtha

Cur síos

Stainless steel pool, depth up to 1.35 m, area approx. 1,100 m², entrance steps, vertical flow through floor channels, children's pool, 2-part with slides and attractions.

Códanna CPV

Construction work for swimming pool

Dátaí & iontráil

Coimriú AI
Logáil isteach don saorán AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Tairiscintí gaolmhara