Éire – Inflatable buildings construction work – Derry~Londonderry Northern Roads Sports Dome (UU Dome)
Cur síos
Ulster University beidh ag ainmniú ceannaire a dhéanamh chun na hoibreacha tógála a sholáthar do struchtúr nua de mhíneachán PVC le tanaíocht ("an Dóm"). Is í an forfheidhmiú seo a bhfuil ann struchtúr de mhíneachán PVC le tanaíocht (an Dóm) le 15,700m² de mhéad ar an urlár domhain. Beidh an scéim chomh maith ag áireamh oibreacha ar an suíomh níos leithne, lena n-áirítear páirc áirtheach, spás do shaoránachtaí, ionad iontrála athraithe ó thuaidh na Bóthar Northland agus infreastruchtúr comhordaithe, ar son Ollscoil Uladh. Caithfidh an tionscadal a bheith críochnaithe roimh Lúnasa 2028 agus tá sé páirceáil le Clár PEACEPLUS (SEUPB). Beidh an tAinmniúchán a bhíonn ann an tAinmniúchán Nua-Innealtóireachta 4 (NEC4) Roghanna B Conradh Priced le liosta de mhéid.
Códanna CPV
Dátaí & iontráil
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Tairiscintí gaolmhara
Ireland – Building construction work – Design and build Dublin Air Traffic Control Centre (ATCC) contingency room
The Irish Air Navigation ServiceÉireBuilding construction workWorks for complete or part construction and civil engineering workElectrical installation workDéadlín i 36 láFoilsithe ar 02 Samh 2026
Ireland – Construction work – Tender No 21 Main Contractor and PSCS Services for Upgrade / Alteration Works at Osprey House
The Irish Air Navigation ServiceÉireConstruction workBuilding alteration workWorks for complete or part construction and civil engineering workDéadlín i 29 láFoilsithe ar 02 Samh 2026
Ireland – Construction work – Request for Expressions of Interest for Purpose-Built Student Accommodation ("PBSA") - Potential On-Campus and Off-Campus Development Opportunities
National Development Finance AgencyÉireConstruction workRepair and maintenance servicesRepair and maintenance services of building installationsDéadlín i 24 láFoilsithe ar 02 Samh 2026
Ireland – General construction work for pipelines – New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village
New Inn Group Water Scheme 2ÉireGeneral construction work for pipelinesConstruction work for water and sewage pipelinesPipelaying construction workDéadlín i 15 láFoilsithe ar 01 Samh 2026