Norway – Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork – Competition - Framework agreement for renovation no-dig, water pipelines including manholes.
Cur síos
The framework agreement is for the renovation of water pipelines and manholes when blocking out. Controlled drilling, pilot pipe drilling and hose renovation are not included in the framework agreement. The aim of the framework agreement is to cover the need for renovation of water pipelines, where blocking out can be used as a method, as well as renovation of manholes and re-connection of private service pipes. In addition to blocking out, there will be a limited need for renovation by using traditional trench excavation in cases where blocking out cannot be carried out. The contracting authority is planning for two call-offs per annum, with each call-off consisting of packing several measures. The contracting authority plans to renovate approx. 3,000 metres per annum and increase the number of metres during the contract period. The actual extent will vary, however, and the contracting authority is not obligated to the above mentioned estimate. In addition to planned measures, urgent orders may occur. The framework agreement ́s estimated financial framework, including an option for an extension, is NOK 415,000,000,-, while the maximum limit is NOK 600,000,000,-. This is based on a calculation of the estimated price of 3,000 metres per annum, which can be increased to 4,000 metres per annum. The framework agreement period is 2 + 1 + 1 + 1 + 1 years.
Códanna CPV
Dátaí & iontráil
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Tairiscintí gaolmhara
Norway – Plumbing and sanitary works – R02084 - Plumbing services Eastern Region - Rena, Elverum, Hamar
Forsvarsbyggan IoruaPlumbing and sanitary worksWeldingThermal insulation workDéadlín i 30 láFoilsithe ar 12 DFómh 2026
Norway – Nursing home construction work – ÅM-26-01 Partnering contract health centre.
Åmot kommunean IoruaNursing home construction workConstruction workWorks for complete or part construction and civil engineering workNíl deireadh ar leithFoilsithe ar 11 DFómh 2026
Norway – Construction work – Bridge maintenance area mid 2027 - 2028
Statens vegvesenan IoruaConstruction workConstruction work for bridgesBridge construction workDéadlín i 27 láFoilsithe ar 11 DFómh 2026
Norway – Electrical installation work – Framework agreement for electrician services for old Hedmark county.
INNLANDET FYLKESKOMMUNEan IoruaElectrical installation workConstruction workBuilding installation workDéadlín i 31 láFoilsithe ar 08 DFómh 2026