Séim le haghaidh an ábhar
Ar ais go lorg

An Fhrainc – Construction, foundation and surface works for highways, roads – A8/A51 - Création de la liaison Lyon/Gap phase 2 – Marché TOACER

AUTOROUTES DU SUD DE LA FRANCE (ASF)an FhraincFoilsithe ar 02 Aib 2026
Níl deireadh aon áit

Cur síos

Déanamh brealláin mhórtóir idir na mótarbhealaí A8 Lyon agus A51 Gap.

Códanna CPV

Construction, foundation and surface works for highways, roadsDemolition workEngineering works and construction worksRain-water basin construction workFencing, railing and safety equipment installation workEarthmoving workRoad-surface painting workSurface work for highwaysInstallation of road signals

Dátaí & iontráil

Coimriú AI
Logáil isteach don saorán AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Tairiscintí gaolmhara