Ar ais go lorg
Tá an iontráil seo thart.
Írország – Tűzmegelőző szerelési munkák – Contractor Framework for Fire Safety Remediation Works to residential properties for Respond
Respond IrelandÉireFoilsithe ar 18 Feabh 2026
Tá an deireadh seo caiteCur síos
Respond have employed a Fire Engineering Consultant to carry our Fire Risk Assessments on their residential apartment blocks and now require works contractors to carry out the identified remediation works.
Códanna CPV
Fire-prevention installation worksFire doorsFireproofing workBuilding construction work
Dátaí & iontráil
Sáraithe AI
Logáil isteach don saorán AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Tairiscintí gaolmhara
Írország – Építési munkák – Connolly Dry Canteen DFTC Curragh Camp
Irish Defence Forces_1144ÉireConstruction workBuilding construction workWindows, doors and related itemsDéadlín i 20 láFoilsithe ar 21 Iúil 2026
Írország – Építési munkák – Contractor Framework for Various Roads, Bridges, Public Realm and Sustainable Transportation Infrastructural Projects 2026 - 2030, €5M to €14M
Cork City CouncilÉireConstruction workEngineering works and construction worksSurface work for roadsNíl deireadh ar leithFoilsithe ar 21 Iúil 2026
Írország – Csővezeték, hírközlési és villamos vezeték építése autópályák, közutak, repülőterek és vasutak számára; terepegyengetés – Piltown Town Centre Regeneration, Co. Kilkenny
Kilkenny County Council_1185ÉireConstruction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatworkDrainage and surface worksConstruction, foundation and surface works for highways, roadsDéadlín i 41 láFoilsithe ar 21 Iúil 2026
Írország – Építési munkák – Conference Room Plunkett Mess DFTC Curragh Camp
Irish Defence Forces_1144ÉireConstruction workBuilding construction workWindows, doors and related itemsDéadlín i 19 láFoilsithe ar 21 Iúil 2026