Írország – Építési munkák – Finglas Primary Care Centre
Cur síos
New build, four-storey with roof plant level, gross internal area approximately 10,517 sqm. The development comprises a HSE Primary Care Centre and GP block with a Tusla child and family agency office in the north-east block, served by two internal landscaped courtyards. The main public entrance is located on the south elevation off a new access road, with a secondary 7-day access entrance on the west elevation off Cardiffsbridge Road. The building is constructed over five levels with finished floor levels rising from 61.000m at Level 00 to 76.800m at Level 04, with roof plant set back 3.5m from the facade and screened at Level 04. External works include a connection to the new access road, 88 car parking spaces, 64 sheltered cycle spaces, hard and soft landscaping and all associated site and enabling works.
Códanna CPV
Dátaí & iontráil
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Tairiscintí gaolmhara
Írország – Repülőterek, futópályák és manőverezési felület építése – Apron Safety Reconfiguration Project
Connaught Airport Development Company LtdÉireConstruction work for airfields, runways and manoeuvring surfacesConstruction work for airportsConstruction work for airfieldsNíl deireadh ar leithFoilsithe ar 17 Lún 2026
Írország – Egycélú sportlétesítmények építése – Phase 2 Construction of New Clubhouse and Dressing Rooms - Internal Finishes
Killala GAAÉireSingle-purpose sports facilities construction workConstruction workDéadlín i 27 láFoilsithe ar 17 Lún 2026
Írország – Tetőjavítás – “Request for Tender for Roof Repairs at An Grianán Adult Education College, Termonfeckin, Co. Louth”
The Countrywomens TrustÉireRoof repairRoof works and other special trade construction worksErection and related works of roof frames and coveringsDéadlín i 28 láFoilsithe ar 17 Lún 2026
Írország – Hulladékkezelő mű építése – St. Cuan's College
St. Cuans CollegeÉireWaste-treatment plant construction workSewage treatment worksWastewater treatment plant construction workDéadlín i 31 láFoilsithe ar 17 Lún 2026