Ar ais go lorg
Tá an iontráil seo thart.
Írország – Gépészeti szerelések – EWS-Upgrade of Existing Gas Proving Systems and replacement of Oil-Fired Boilers in Coláiste Eoin, Hacketsown, Co Carlow
Kilkenny and Carlow ETBÉireFoilsithe ar 21 Meith 2026
Tá an deireadh seo caiteCur síos
The emergency works project involves replacing the existing gas proving systems in two science rooms, a home economics room, an engineering and prep room, as well as replacement of flexible gas hoses in the engineering room. The emergency also includes replacement of the 2 existing oil-fired boilers with new LPG gas boilers and heating controls, and replacing current oil tank with a gas tank.
Códanna CPV
Mechanical installationsMechanical engineering installation worksInstallation services of electrical and mechanical equipmentInstallation services of mechanical equipmentBoiler installationsBoilersBoiler installation work
Dátaí & iontráil
Sáraithe AI
Logáil isteach don saorán AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Tairiscintí gaolmhara
Írország – Mérnöki és építési munkák – MetroLink, Dublin – M120 Heavy Civils Enabling Works Framework Agreement
Transport Infrastructure Ireland (TII)ÉireEngineering works and construction worksTraversing bridgeSite preparation workNíl deireadh ar leithFoilsithe ar 20 Iúil 2026
Írország – Lakóházak építése – TEN2600141 - CfT for Construction of 44 Units at Lios na Ri, Cootehill, Co. Cavan for Cavan County Council
Cavan County CouncilÉireHouses construction workMulti-dwelling buildings construction workConstruction work for multi-dwelling buildings and individual housesDéadlín i 29 láFoilsithe ar 20 Iúil 2026
Írország – Szennyvízszivattyú-állomás építése – Supply, Install and Commission of Surface Water Pumping Station and Ancillary Works (MEICA)
Office of Public Works (OPW)ÉireSewage pumping stations construction workWastewater pumping stationDredging and pumping worksDéadlín i 27 láFoilsithe ar 20 Iúil 2026
Írország – Építési munkák – 9163 Single Supplier Framework Agreement for Design and Build Civil and Structural Contractor for DART+
Iarnród Eireann-Irish RailÉireConstruction workSite preparation workBuilding demolition and wrecking work and earthmoving workNíl deireadh ar leithFoilsithe ar 20 Iúil 2026