Séim le haghaidh an ábhar
Ar ais go lorg

Norway – Calculation of costs, monitoring of costs – Framework agreement for cost calculations and uncertainty analysis.

Oslo kommune v/ Eiendoms- og byfornyelsesetatenan IoruaFoilsithe ar 26 DFómh 2026
20 lá fágtha

Cur síos

The aim of the framework agreement is to cover the agency's ongoing need for external assistance regarding calculation of costs with uncertainty analyses, connected to the development of public infrastructure. There will mainly be grey-blue-green measures, such as streets, pedestrian and footpaths, footpaths, squares, parks and footbridges, streams and surface water systems that shall be cost calculated. However, there can also be cases where the infrastructure measures below the ground are cost calculated, such as other water and sewage systems and measures such as moving power lines. Some other types of cost calculation assignments can occur.

Códanna CPV

Calculation of costs, monitoring of costsEngineering design servicesProject and design preparation, estimation of costsInfrastructure works consultancy services

Dátaí & iontráil

Coimriú AI
Logáil isteach don saorán AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Tairiscintí gaolmhara