Éire – Pier construction work – Roonagh Pier - Repair and Upgrade Works

Mayo County Council_1127ÉireFoilsithe ar 26 Márta 2026
Níl deireadh aon áit

Cur síos

Roonagh Pier has been structurally undermined over time and now requires to be upgraded and repaired. The works required will include the following elements of work. (This is a non-exhaustive list of the potential works elements.) • Piling through the existing pier structure and into solid bedrock below the pier structure • Provision of a new in situ reinforced concrete deck overlay slab to the pier over its full length • Repair and upgrading of the berthing face • Repairs and upgrading to elements of the pier structure • Repair and upgrade of access steps for ferry boat berthing • Provision of new pier furniture, bollards, ladders, rings • Upgrade of general signage, services, power, water and public lighting • Temporary removal of the pier crane and re-installation on the new pier deck surface

The works are envisaged to be completed over a period of 8 months between September 2026 and the end of April 2027. It is envisaged that a minimum of 3 and a maximum of 5 tenderers will be invited to tender for the repair and upgrade works contract.

Códanna CPV

Pier construction workConstruction work for water projects

Dátaí & iontráil

Coimriú AI
Logáil isteach don saorán AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Tairiscintí gaolmhara