Éire – Building construction work – Design, Construction and Delivery of Cherry Orchard (Affordable for Sale) Housing Development (Pro405)
Cur síos
An tAchtóiríocht (an “Achtóiríocht” (CA) nó an “LDA”), a bhí bunaithe sa bhliain 2018, is comhlacht atá faoi smacht stáit, le mandáta an tionscadal a chur chun cinn a bhfuil tithíochtaí cóir le haghaidh aonair agus teaghlaigh trí thionscadal a dhéanamh ar shuíomhanna agus lannbhancanna i ngnátháirí. Le tuilleadh eolais, tabhair cuairt ar www.lda.ie. Is tionscadal tithíochta nua é an Forbairt Dáiríochtaí do Dhíol sa Ghairíon Órga, ar shuíomh c. 6 hectare, ar shuíomh glas, i nGairíon Órga, Baile Átha Cliath 10. Beidh an tionscadal tithíochta a bhfuil ar siúl ag an CA 172 áit áitiúil. Féach ar an gCeistfhreagrachas Roimh-Achtóireacht (PQQ) le tuilleadh eolais.
Códanna CPV
Dátaí & iontráil
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Tairiscintí gaolmhara
Ireland – Building construction work – Design and build Dublin Air Traffic Control Centre (ATCC) contingency room
The Irish Air Navigation ServiceÉireBuilding construction workWorks for complete or part construction and civil engineering workElectrical installation workDéadlín i 36 láFoilsithe ar 02 Samh 2026
Ireland – Construction work – Request for Expressions of Interest for Purpose-Built Student Accommodation ("PBSA") - Potential On-Campus and Off-Campus Development Opportunities
National Development Finance AgencyÉireConstruction workRepair and maintenance servicesRepair and maintenance services of building installationsDéadlín i 24 láFoilsithe ar 02 Samh 2026
Ireland – Construction work – Tender No 21 Main Contractor and PSCS Services for Upgrade / Alteration Works at Osprey House
The Irish Air Navigation ServiceÉireConstruction workBuilding alteration workWorks for complete or part construction and civil engineering workDéadlín i 29 láFoilsithe ar 02 Samh 2026
Ireland – General construction work for pipelines – New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village
New Inn Group Water Scheme 2ÉireGeneral construction work for pipelinesConstruction work for water and sewage pipelinesPipelaying construction workDéadlín i 15 láFoilsithe ar 01 Samh 2026