Ar ais go lorg
Éire – Pipelaying construction work – Tooreen Aghamore Group Water Supply Scheme - Water Meter Upgrade and Network Improvement Works Phase 2
Tooreen Aghamore GWSÉireFoilsithe ar 11 Samh 2026
28 lá fágthaCur síos
Athsholáthar agus soláthar nua píopaí scaoilteachta uisce, méadraí tomhaltóirí agus méadraí fliúchlóirí, lena n-áirítear logáin dáta
Códanna CPV
Pipelaying construction workGeneral construction work for pipelinesConstruction work for water and sewage pipelines
Dátaí & iontráil
Coimriú AI
Logáil isteach don saorán AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Tairiscintí gaolmhara
Ireland – Building completion work – Renovation of Fishbowl Youth and Community Centre at Drewsboro, Scariff, Co. Clare
Ard Aoibhinn CommunityÉireBuilding completion workConstruction workSite preparation workDéadlín i 19 láFoilsithe ar 11 Samh 2026
Ireland – Works for complete or part construction and civil engineering work – Raheen Group Water Scheme Watermain Replacement
Raheen Group Water SchemeÉireWorks for complete or part construction and civil engineering workDéadlín i 78 láFoilsithe ar 11 Samh 2026
Ireland – Installation of doors – Emergency Works for Disabled Doors - Automatic Entrance Doors - Glenart College, Arklow, Co. Wicklow
Kildare and Wicklow Education and Training BoardÉireInstallation of doorsConstruction work for school buildingsOverhaul and refurbishment workDéadlín i 28 láFoilsithe ar 11 Samh 2026
Ireland – Roof-covering work – EMERGENCY WORKS SCHEME REPLACEMENT OF ACM SLATES
Herbertstown National SchoolÉireRoof-covering workRoof-covering and roof-painting workAsbestos-removal workDéadlín i 25 láFoilsithe ar 10 Samh 2026