Éire – Building construction work – Conservation, refurbishment and adaptive reuse works at the former Tipperary Town Courthouse and Bridewell
Cur síos
Tionscadal Athchóirithe agus Athnuachana a bhfuil ar siúl do Chúirt na Cathrach agus Bridewell Chontae Thiobraid Árann, chun a úsáid mar Lárionad Oideachais do Dhaoine Fásta, a bhéas déanta i dhá staid. Cuimsíonn Staid 1 athnuachan an Chúirte agus Teach an tSeansailéara Bridewell, chomh maith le seomra nua planda agus obair tionscailt thar lear. Cuimsíonn Staid 2 na hOibreacha Roghnaithe athnuachan na dTaoibh Thuaidh agus Theas Bridewell agus dhá droichead nua ar an gcéad urlár a n-áiríonn iad le Teach an tSeansailéara. Tá Staid 2 na hOibreacha Roghnaithe faoi bhaint le maoiniú agus a bhéas déanta amháin má bhíonn an tOstachán ar aon mhíniú a thabhairt chun an tOstachán le fógra scríofa, ar a aontas féin.
Códanna CPV
Dátaí & iontráil
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Tairiscintí gaolmhara
Ireland – Construction work – Establishment of a Multiparty Framework for the provision of Domestic Energy Efficiency Retrofitting services in County Donegal
Donegal County Council_1193ÉireConstruction workBuilding construction workBuilding installation workDéadlín i 46 láFoilsithe ar 22 Samh 2026
Ireland – Works for complete or part construction and civil engineering work – Claureen Link Road Phase 1
Clare County CouncilÉireWorks for complete or part construction and civil engineering workRoad construction worksMain road construction worksDéadlín i 18 láFoilsithe ar 22 Samh 2026
Ireland – Refurbishment of run-down buildings – Refurbishment and Adaptive Re-use of West Gate House and Drogheda Youth Development Building
Louth County Council_381ÉireRefurbishment of run-down buildingsBuilding construction workBuildings of particular historical or architectural interestNíl deireadh ar leithFoilsithe ar 19 Samh 2026
Ireland – Footpath construction work – Erris Looped Walks, Corclough Village, Mullet Peninsula, Co. Mayo
Údarás Na Gaeltachta_289ÉireFootpath construction workBoardwalk construction workPedestrian ways construction workDéadlín i 42 láFoilsithe ar 19 Samh 2026