Norway – Secondary school construction work – 2619001 Hinnøya Sixth Form College - Turnkey Contract with Interaction
Opis
General information about the competition The Contracting Authority Troms County c/o department operations and property (hereafter called the contracting authority) invites tenderers to a competition with negotiations. See the www.tromsfylke.no for further information on the contracting authority. Objective and brief about the procurement The enquiry is for a turnkey contract with solution proposals and interaction in the early phase for the project Hinnøya sixth form college in Harstad (HVG). The competition consists of two stages: · Stage 1: Prequalification · Stage 2: Negotiated procedure between the prequalified candidates The invitees after the prequalification will be notified through the competition implementation tool (KGV). Based on the award criteria in the competition description, the contracting authority will determine a winner who will be awarded the assignment. The project includes the construction of a new sixth form college in the centre of Harstad. Construction phase 1 includes approx. 22,300 m2 and it shall be completed autumn 2030. Future expansion shall be facilitated constructively of up to 8,000 m2. Any realisation of an expansion of up to 8,000 m² will be included in construction stage 2. The date for realisation of construction stage 2 has not been decided, and construction phase 2 is not included in this procurement. The project aims to design and construct within a combined cost framework for the turnkey contractor, which does not exceed NOK 1,180,000,000, inc. VAT, excluding all options. Tenders exceeding the limit may be rejected. As a part of the total tender offer, a price shall be given on the interaction/optimisation and preparation phase, see annex F1 tender form. TFK reserves the right to end the project, after the project competition, if, due to economic or political reasons, decided by the County Committee (FU) to postpone, or terminate the project. A design contest has been held, where the winner was published 29.09.2023. The preliminary project was completed in spring 2025 with revisions in autumn 2025. The basis for the framework application is planned to be completed in spring 2027. The project will be carried out as a turnkey contract in the execution phase with a prior interaction phase/optimisation phase. The group will be transported to the turnkey contractor. The planned time axis is construction stage 1, which includes approx. 22,300 m2 gross: Framework application: planned for autumn 2027. The construction start is planned for January 2028. The detailed and construction phase: planned for January 2028 - March 2030. Fixtures; planned in the period from April 2030 - June 2030 Start of school: planned for autumn 2030. The building shall be certified in accordance with BREEAM-NOR 'Very Good'. Option (2) has been included for the new Sports Hall, see annex Annex G2_Opsjon 2 Sports Hall. The sports hall is planned as a separate building on the site south of the new sixth form college and shall room the school ́s physical education and sports facilities. The roof will be an outside area with direct connection to the school building. The project is an option because land acquisition was first clarified in Q1 2026 and the system shall be further developed together with the county, contractor and users. The project is based on the winning proposal from the "Varden" planning and design competition. The project must see to the interface with accompanying neighbours for the project HVG. The HVG project must ensure that neighbours will be fully operational while the HVG project is carried out. Neighbours are Equinor, Harstad ship industry, Berggård Amundsen (BA building) and Vågsfjord eiendom. The project must also see to interface with other construction projects such as Dokkhallen. Further details on the assignment The builder ́s description of the delivery is in annex A to G in the tender documentation part II. Tenderers are requested to read the entire tender documentation together for the preparation of tender offers. It has recently been decided that the name of the project is Hinnøya sixth form college. The term "New sixth form college in Harstad (NVH) is used in parts of the tender documentation and accompanying annexes." These designations refer to the same project. Hinnøya sixth form college shall be used as the correct and applicable project name. The background for different names is that decisions on names have been made at a later date, and it has not been practically possible to update all documents and annexes before the tender documentation is sent out. The contracting authority can reject all the tenders if the result of the competition gives a justifiable reason for it.
CPV kodovi
Dokumenti i prijava
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Povezane nabave
Norway – Construction work – Waste Facility Moskog - SUM
Asplan Viak ASNorveškaConstruction workRok za 44 danaObjavljeno na 23. stu 2026.
Norway – Construction work – 1000444 Eineåsen nursery - turnkey contract
Bærum kommuneNorveškaConstruction workRok za 58 danaObjavljeno na 22. stu 2026.
Norway – Construction work – Fløysbonn secondary school
NORDRE FOLLO KOMMUNENorveškaConstruction workConstruction work for school buildingsArchitectural, engineering and planning servicesRok za 51 danObjavljeno na 19. stu 2026.
Norway – Construction work – Framework agreement electronic security systems (ESS)
Departementenes sikkerhets- og serviceorganisasjonNorveškaConstruction workEntrance cardsSmart card readersNema rokaObjavljeno na 18. stu 2026.