Švedska – Građevinski radovi na prevodnicama na kanalima – E21 - Nya slussar - Trollhätte kanal, Trollhättan

Trafikverket MyndighetŠvedskaObjavljeno na 06. svi 2026.
Nije naveden rok

Opis

Observe revised schedule and additional works (klaffbro, Västergärdetbron) below. Contract form: Joint venture (TEM) with Phase 1 according to ABK09 and Phase 2 according to ABT06. In works with new slussled Trollhättan includes:

• Construction of three new locks consisting of an upstream triangular lock and a downstream lock staircase with an intermediate approximately 150 long lock canal

• Extensive rock excavation for the lock line

• Lock gates and concrete quays

• Lock technology and lock gates

• Technical buildings and canal control center

• Widening of the existing rock canal

• Klaffbro over the rock canal (Västergärdetbron)

• Openable bridge over the new lock line

• Dredging of the new fairway

• Temporary loading port

• Construction of roads, walkways and cycle paths

• Dam construction RD piles with crown beam, and lamellar dam

• Dam safety of the existing lock facility, and adaptation of the existing lock area

• Remediation of contaminated land on the existing industrial area

Approximate quantities

• Rock excavation lock line: 750 000 m3

• Earth excavation lock line: 100 000 m3

• Rock excavation rock canal: 80 000 m3

• Concrete: 65 000 m3

• Steel 500 tonnes

• Lock gates and quays 1 100 m

• Dredging clay: 75 000 m3

• Dredging rock: 15 000 m3

CPV kodovi

Canal locks construction workLock gatesSluicesConstruction work for water projects

Dokumenti i prijava

Sažetak AI
Prijavi se za sažetak AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Povezane nabave