Preskoči na sadržaj
Natrag na pretraživanje

Njemačka – Radovi instaliranja opreme za zaštitu od požara – Ertüchtigung Flughafentunnel B312 - Technische Ausrüstung - LOS2

Flughafen Stuttgart GmbHNjemačkaObjavljeno na 30. kol 2026.
Nije naveden rok

Opis

Uprgrading of the B312 Airport Tunnel

The FSG is the operator of the B312 Airport Tunnel between Filderstadt-Bernhausen and Plieningen. The road authority is the LRA Esslingen. During the investigations, it was found that the tunnel has outdated and, in part, non-RABT- or EABT-80/100-compliant structural and operational equipment. To reduce the risk expectation value to the required level, extensive renovation and upgrading measures are to be carried out in the area of the electromechanical tunnel equipment and a fire-fighting system is to be retrofitted. A so-called pump house, consisting of a pump room and a firewater basin, will be built for the firewater storage and the accommodation of the pump systems. Structural measures for barrier systems, height controls, traffic signs, etc. are planned in the area of the tunnel portals. The overall measure is divided into the following 5 lots:

Lot 1: Electrical Engineering BTA

Lot 2: Fire-fighting system (HDWNA)

Lot 3: Structural measures

Lot 4: Renovation of fire protection plaster on tunnel ceiling

Lot 5: New construction of pump house (firewater basin and pump room)

CPV kodovi

Firefighting equipment installation workElectrical wiring and fitting workPlumbing and sanitary worksElectrical wiring workElectrical fitting workInstallation of cable infrastructureInstallation of cable layingElectrical engineering installation worksElectricity supply installationsLow-voltage installation workSwitching station installation workFireproofing workSecurity, fire-fighting, police and defence equipmentPumps for firefighting

Dokumenti i prijava

Sažetak AI
Prijavi se za sažetak AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Povezane nabave