Tartalomhoz ugrás
Vissza a kereséshez
Ez a kiválasztás lejárt.

Lengyelország – Víz- és szennyvízvezetékek építése – Budowa sieci kanalizacji sanitarnej w miejscowości Przyłęki, Prądki i Ciele w Gminie Białe Błota - etap I część I

Gmina Białe BłotaLengyelországMegjelent 2026. aug. 12.
Határidő lejárt

Leírás

A tender procedure is conducted in the form of an unrestricted tender, as referred to in Article 132 of the Public Procurement Act, hereinafter referred to as the "Pzp Act".

5.1. Task name assigned by the Purchaser: Construction of the sanitary sewerage network in the localities of Przyłęki, Prądki and Ciele in the Gmina Białe Błota – Stage I Part I

The subject of the contract is the construction of a gravity-pressure sanitary sewerage system in the localities of Przyłęki, Prądki and Ciele, Gmina Białe Błota, Bydgoszcz County, Kujawsko-Pomorskie Voivodeship, including inspection wells, ventilation-ventilation inspection wells, pressure relief wells, sewer connections. The Purchaser does not envisage the selection of the most advantageous offer with the possibility of conducting negotiations. The Purchaser makes the Specification of Contract Conditions and all documents constituting its annexes available on the dedicated page of the procurement platform under the link http://platformazakupowa.pl/pn/bialeblota The Purchaser allows changes to the contract only within the scope indicated in the contract project, which is an integral part of the SWZ.

5.3. The Specification of Contract Conditions is hereinafter referred to as the "SWZ" or "Specification".

5.4. Description of the subject of the contract. The subject of the contract and the terms of the contract are described in detail in Volumes II and III of this SWZ. The required technical parameters are given in the design documentation and the STWiOR.

5.5. The Purchaser does not allow partial offers to be submitted. The scope and nature of the works covered by the contract require it to be included within the framework of a single task due to the special nature of the work. The tasks require effective coordination of work between brigades, the division of equipment and materials. Dividing the work into parts would be associated with excessive technical difficulties, extended implementation time and increased costs of performing the task. The organisation of the work must take place within the framework of one company to ensure effective implementation of the task.

5.6. The Purchaser does not allow variant offers to be submitted.

5.7. The implementation of the contract is subject to Polish law, in particular the Civil Code and the Public Procurement Act. The Contractor will be obliged to carry out building works in accordance with Polish law, in particular with technical and building regulations, regulations concerning independent technical functions in construction and regulations concerning products and materials used in construction.

5.8. The Purchaser does not envisage the possibility of awarding contracts, as referred to in Article 214(1)(7) of the Pzp Act.

5.9. The Purchaser does not require Contractors to conduct a site visit, as referred to in Article 131(2) of the Pzp Act. The Purchaser recommends conducting a site visit of the places where the building works covered by this contract will be carried out in order to check the conditions of the construction site and the conditions related to the performance of the works that are the subject of this procedure and in order to obtain any additional information necessary and useful for the valuation of the offer.

5.10. The requirements for the employment by the Contractor or subcontractor, on the basis of an employment relationship, of persons performing the tasks indicated by the Purchaser in the context of the implementation of the contract, have been specified in the further part of the SWZ. The above requirements specify in particular: a) the type of tasks related to the implementation of the contract, which are subject to the requirement of employment on the basis of an employment relationship by the Contractor or Subcontractor of persons performing tasks during the implementation of the contract, b) the method of verifying the employment of these persons, c) the Purchaser's entitlements in the context of controlling the Contractor's compliance with the requirements related to the employment of these persons and the penalties for non-compliance with these requirements, The Purchaser requires the employment, on the basis of an employment contract, by the contractor or subcontractor, of persons performing all the physical work related to the performance of all the tasks covered by the contract and described in the OPZ, the performance of which involves performing work in the manner specified in Article 22(1) of the Act of 26 June 1974 - Labour Code: worker/monter of sewerage network installations, brigade leader, assistant, excavator operator, loader excavator operator, compactor operator, lorry driver, persons who perform tasks directly related to the performance of the works, i.e. so-called physical workers. The obligation referred to in the previous sentence does not apply to persons performing independent technical functions in construction within the meaning of the Act of 7 July 1994 - Building Law. The method of verifying the employment of persons performing work in the manner specified in Article 22(1) of the Act of 26 June 1974 - Labour Code and the Purchaser's entitlements in the context of controlling the Contractor's compliance with the requirements related to the employment of these persons and the penalties for non-compliance with these requirements, have been specified in the contract project, which is an integral part of the SWZ.

5.11. The Purchaser does not specify the requirements referred to in Article 96(2) of the Pzp Act.

5.12. The Purchaser does not reserve the possibility of tendering exclusively to contractors, as referred to in Article 94 of the Pzp Act.

5.13. The Purchaser requires, in accordance with the description of the subject of the contract, that the subject of the contract be implemented taking into account the requirements in the context of accessibility for persons with disabilities.

5.14. The Purchaser does not require electronic catalogues to be submitted with the offer.

5.15. The Purchaser does not envisage an electronic auction.

5.16. The Purchaser does not envisage settlement in foreign currencies.

5.17. SUB-CONTRACTING AND KEY PARTS OF THE CONTRACT: a) The Purchaser does not reserve the obligation for the Contractor to personally perform key parts of the contract. b) The Contractor may entrust the performance of part of the contract to a subcontractor. c) The Purchaser requires the Contractor to indicate the parts of the contract, the performance of which it intends to entrust to subcontractors, and to provide the names of the subcontractors, if known, in accordance with point 10.7 IDW.

CPV kódok

Construction work for water and sewage pipelinesSite preparation workSite preparation and clearance workEarthmoving workConstruction work for pipelines, communication and power linesSewerage workRoad-repair worksFencing, railing and safety equipment installation work

Dokumentumok és benyújtás

AI összefoglaló
Jelentkezzen be egy AI összefoglalóhoz

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Kapcsolódó közbeszerzések