Írország – Egyéb épületbefejezési munka – Storage Solutions for the Irish Defence Forces
Leírás
1. Background The Defence Forces Corps of Engineers require storage solutions for new equipment which will shortly be delivered for use by the Defence Forces. The requirement is to design, construct and install these storage solutions for the Irish Defence Forces at up to nine (9) locations across the country. 2. Scope and extent of work The Corps of Engineers require the selected contractor to design, construct and install storage solutions for the Irish Defence Forces at the following locations: - McKee Barracks, Blackhorse Avenue, D7 - Cathal Brugha Barracks, Rathmines, D6 - Casement Aerodrome, Baldonnel, Co. Dublin - Curragh Camp, Co. Kildare - Custume Barracks, Athlone, Co. Westmeath - Stephens Barracks, Kilkenny - Dun Ui Mhaoiliosa, Renmore, Co. Galway - Collins Barracks, Old Youghal Road, Cork All elements are required to be installed as soon as possible from contract signing with the selected provider to support the delivery of the new equipment in 2026.
CPV kódok
Dokumentumok és benyújtás
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Kapcsolódó közbeszerzések
Írország – Építési munkák – Pyrite Remediation Programme - Contractor Framework
Housing and Sustainable Communities AgencyÍrországConstruction workHatáridő 17 nap múlvaMegjelent 2026. aug. 10.
Írország – Teljes vagy részleges magas- és mélyépítési munka – WCC342026 Local Building Maintenance And Refurbishment Works
Wicklow County CouncilÍrországWorks for complete or part construction and civil engineering workBuilding installation workConstruction workHatáridő 30 nap múlvaMegjelent 2026. aug. 10.
Írország – Elemi iskola építése – New Special Educational Needs (SEN) Extension and Roof Refurbishment Project at Scoil Mháthair Dé, Limerick
Scoil Mhathair Dé - Primary SchoolÍrországPrimary school construction workBuilding construction workHatáridő 22 nap múlvaMegjelent 2026. aug. 10.
Írország – Épületszerelési munka – Energy upgrades to Unit 1I - Scioból na bhFear Gaoth Dobhair
Údarás Na Gaeltachta_289ÍrországBuilding installation workHeating, ventilation and air-conditioning installation workElectrical installation workHatáridő 31 nap múlvaMegjelent 2026. aug. 10.