Torna alla ricerca
Austria – Lavori di costruzione – Straßenbau: Gussasphaltarbeiten in Wien (Rahmenvertrag)
Magistrat der Stadt Wien - Magistratsabteilung 28AustriaPubblicato il 11 ott 2026
22 giorni rimastiDescrizione
Lavori di costruzione stradale
Codici CPV
Construction workRoad construction worksPaving and asphalting worksCarriageway resurfacing worksSurface work for streetsTrench-digging workGeneral construction work for pipelinesConstruction work for water and sewage pipelinesMain road construction worksSecondary road construction workDual carriageway construction workSingle carriageway construction workAccess road construction workSlip road construction workRoad junction construction workT-junction construction workCrossroad construction workRoad-maintenance worksRoad-repair worksResurfacing worksFootpath construction workCycle path construction workSurface work for footpathsPedestrian ways construction workExcavating workDrainage works
Documenti e invio
Riepilogo AI
Accedi per un riepilogo AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Appalti correlati
Österreich – Installation von Heizungs-, Lüftungs- und Klimaanlagen – ARA Villach - Wärmepumpenanlage
KELAG Energie & Wärme GmbHAustriaHeating, ventilation and air-conditioning installation workNessuna scadenza indicataPubblicato il 11 ott 2026
Österreich – Bauarbeiten für Eisenbahnlinien und Seilbahnsysteme – Bludenz; Adaptierung Ausfahrt Richtung Arlberg; Bau - Baumeisterarbeiten Hauptbaumaßnahmen
ÖBB-Infrastruktur AGAustriaConstruction work for railways and cable transport systemsNessuna scadenza indicataPubblicato il 11 ott 2026
Österreich – Dachdeckarbeiten – Betriebsfeuerwehr - Zentrale - Los 3 - Dachdecker- Spenglerarbeiten inkl. Fassade
MANAGEMENTSERVICE LINZ GmbHAustriaRoof-covering workRoof-covering and roof-painting workErection and related works of roof frames and coveringsNessuna scadenza indicataPubblicato il 11 ott 2026
Österreich – Bauarbeiten für Autobahnen – A02 Süd Autobahn, INSB V03 - V04.2, AB-Km 339,70 - AB-Km 342,58 - Instandsetzung Straße und Brücke
Autobahnen- und Schnellstraßen-Finanzierungs-AktiengesellschaftAustriaMotorway construction worksScadenza tra 10 giorniPubblicato il 11 ott 2026