Vai al contenuto
Torna alla ricerca

Írország – Középiskola építése – Contractor for Additional Accommodation Reconfiguration and In-Fill Works to provide 1x Art Room, 1x Woodwork room and preparation area to Presentation Secondary School, Ballyphehane, Cork.

Presentation Secondary School (Ballyphehane)IrlandaPubblicato il 02 ago 2026
21 giorni rimasti

Descrizione

The proposed development consists of Reconfiguration Works to provide •1 No. Conversion of Existing Home Economics Room in to Art Room (96.5m²), •1 No. Conversion of Existing Art Room in to Wood Technology Room (99.5m²), •In-Fill construction providing a Wood Machining and Preparation Room of 30m² area. The proposed reconfiguration layouts make the maximum use of the existing available space within the existing classrooms and the additional in-fill Wood Machining and Preparation Room slots within the existing footprint of the building.

Codici CPV

Secondary school construction workConstruction work for school buildingsWorkshops construction workBuilding construction work

Documenti e invio

Riepilogo AI
Accedi per un riepilogo AI

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Appalti correlati