Torna alla ricerca
Questo appalto è scaduto.
Írország – Gépészeti szerelések – EWS-Upgrade of Existing Gas Proving Systems and replacement of Oil-Fired Boilers in Coláiste Eoin, Hacketsown, Co Carlow
Kilkenny and Carlow ETBIrlandaPubblicato il 21 giu 2026
Scadenza superataDescrizione
The emergency works project involves replacing the existing gas proving systems in two science rooms, a home economics room, an engineering and prep room, as well as replacement of flexible gas hoses in the engineering room. The emergency also includes replacement of the 2 existing oil-fired boilers with new LPG gas boilers and heating controls, and replacing current oil tank with a gas tank.
Codici CPV
Mechanical installationsMechanical engineering installation worksInstallation services of electrical and mechanical equipmentInstallation services of mechanical equipmentBoiler installationsBoilersBoiler installation work
Documenti e invio
Riepilogo AI
Accedi per un riepilogo AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Appalti correlati
Írország – Mérnöki és építési munkák – MetroLink, Dublin – M120 Heavy Civils Enabling Works Framework Agreement
Transport Infrastructure Ireland (TII)IrlandaEngineering works and construction worksTraversing bridgeSite preparation workNessuna scadenza indicataPubblicato il 20 lug 2026
Írország – Lakóházak építése – TEN2600141 - CfT for Construction of 44 Units at Lios na Ri, Cootehill, Co. Cavan for Cavan County Council
Cavan County CouncilIrlandaHouses construction workMulti-dwelling buildings construction workConstruction work for multi-dwelling buildings and individual housesScadenza tra 29 giorniPubblicato il 20 lug 2026
Írország – Szennyvízszivattyú-állomás építése – Supply, Install and Commission of Surface Water Pumping Station and Ancillary Works (MEICA)
Office of Public Works (OPW)IrlandaSewage pumping stations construction workWastewater pumping stationDredging and pumping worksScadenza tra 27 giorniPubblicato il 20 lug 2026
Írország – Építési munkák – 9163 Single Supplier Framework Agreement for Design and Build Civil and Structural Contractor for DART+
Iarnród Eireann-Irish RailIrlandaConstruction workSite preparation workBuilding demolition and wrecking work and earthmoving workNessuna scadenza indicataPubblicato il 20 lug 2026