Vokietija – Kraštovaizdžio darbai – Los 23 Außenanlagen REG HET
Aprašymas
23 išorinių įrenginių
**Technical Specifications**
**23.1.1. General**
**23.1.1.1. Description of the Works**
The Contracting Authority intends to carry out works for the construction of 23 outdoor facilities, including the construction of a new building, the renovation of existing buildings, and the construction of outdoor facilities.
**23.1.1.2. Location of the Works**
The works will be carried out in the following locations:
- Location 1: 100m from the main entrance of the building
- Location 2: 150m from the main entrance of the building
- Location 3: 200m from the main entrance of the building
**23.1.2. Technical Requirements**
**23.1.2.1. Materials**
The materials to be used for the construction of the outdoor facilities must comply with the following standards:
- Concrete: EN 206
- Steel: EN 10025
- Asphalt: EN 13108
**23.1.2.2. Dimensions**
The dimensions of the outdoor facilities must comply with the following requirements:
- Length: 50m
- Width: 30m
- Height: 2.5m
**23.1.2.3. Finishing**
The finishing of the outdoor facilities must comply with the following requirements:
- Surface treatment: smooth
- Colour: grey
- Texture: non-slip
**23.1.3. Testing and Inspection**
**23.1.3.1. Testing**
The Contractor must carry out the following tests:
- Compression test for concrete
- Tensile test for steel
- Flexural test for asphalt
**23.1.3.2. Inspection**
The Contracting Authority will carry out inspections at the following stages:
- Before the start of the works
- During the works
- After the completion of the works
**23.1.4. Health and Safety**
**23.1.4.1. Personal Protective Equipment (PPE)**
The Contractor must provide the following PPE for the workers:
- Hard hats
- Safety glasses
- High-visibility vests
- Safety boots
**23.1.4.2. Safety Measures**
The Contractor must implement the following safety measures:
- Fencing of the worksite
- Signage and warnings
- Emergency procedures
**23.1.5. Environmental Requirements**
**23.1.5.1. Waste Management**
The Contractor must manage waste in accordance with the following requirements:
- Separation of waste
- Recycling of materials
- Disposal of hazardous waste
**23.1.5.2. Noise Pollution**
The Contractor must implement measures to reduce noise pollution, such as:
- Use of low-noise equipment
- Limitation of working hours
- Installation of noise barriers
CPV kodai
Dokumentai ir pateikimas
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Susiję pirkimai
Deutschland – Landschaftsgärtnerische Bauleistungen für Grünanlagen – Samtgemeinde Lüchow (Wendland) - Neubau Grundschule in Wustrow_Los 21 Freianlagen
Samtgemeinde Lüchow (Wendland)VokietijaLandscaping work for green areasDeadline per 54 dienasPublikuota 2026-11-19
Deutschland – Bau von Sporthallen – Neubau Sporthalle - Elektroarbeiten
Stadt Bad WaldseeVokietijaSports hall construction workElectrical installation workLow-voltage installation workDeadline per 18 dienasPublikuota 2026-11-19
Deutschland – Bauarbeiten – Westfalenpark - WERK, Lüftungsarbeiten
Vergabe und Beschaffungszentrum DortmundVokietijaConstruction workDeadline per 47 dienasPublikuota 2026-11-19
Deutschland – Tiefbauarbeiten, außer Tunneln, Schächten und Unterführungen – Haltestelle Landhaus Tiefbauarbeiten
Stuttgarter Straßenbahnen AGVokietijaUnderground work other than tunnels, shafts and subwaysDeadline per 31 dienąPublikuota 2026-11-19