Praleisti į turinį
Grįžti į paiešką

Írország – Középiskola építése – Contractor for Additional Accommodation Reconfiguration and In-Fill Works to provide 1x Art Room, 1x Woodwork room and preparation area to Presentation Secondary School, Ballyphehane, Cork.

Presentation Secondary School (Ballyphehane)AirijaPaskelbta 2026-08-02
21 diena liko

Aprašymas

The proposed development consists of Reconfiguration Works to provide •1 No. Conversion of Existing Home Economics Room in to Art Room (96.5m²), •1 No. Conversion of Existing Art Room in to Wood Technology Room (99.5m²), •In-Fill construction providing a Wood Machining and Preparation Room of 30m² area. The proposed reconfiguration layouts make the maximum use of the existing available space within the existing classrooms and the additional in-fill Wood Machining and Preparation Room slots within the existing footprint of the building.

CPV kodai

Secondary school construction workConstruction work for school buildingsWorkshops construction workBuilding construction work

Dokumentai ir pateikimas

AI santrauka
Prisijunkite, kad gautumėte AI santrauką

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Susiję pirkimai