Praleisti į turinį
Grįžti į paiešką

Horvátország – Víz- és szennyvízvezetékek építése – Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines

KD VODOVOD I KANALIZACIJA d. o. o.KroatijaPaskelbta 2026-08-05
26 dienos liko

Aprašymas

Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.

CPV kodai

Construction work for water and sewage pipelines

Dokumentai ir pateikimas

AI santrauka
Prisijunkite, kad gautumėte AI santrauką

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Susiję pirkimai