Atpakaļ uz meklēšanu
Írország – Középiskola építése – Contractor for Additional Accommodation Reconfiguration and In-Fill Works to provide 1x Art Room, 1x Woodwork room and preparation area to Presentation Secondary School, Ballyphehane, Cork.
Presentation Secondary School (Ballyphehane)ĪrijaPublicēts 2026. g. 02. aug.
21 diena atlikusiApraksts
The proposed development consists of Reconfiguration Works to provide •1 No. Conversion of Existing Home Economics Room in to Art Room (96.5m²), •1 No. Conversion of Existing Art Room in to Wood Technology Room (99.5m²), •In-Fill construction providing a Wood Machining and Preparation Room of 30m² area. The proposed reconfiguration layouts make the maximum use of the existing available space within the existing classrooms and the additional in-fill Wood Machining and Preparation Room slots within the existing footprint of the building.
CPV kodi
Secondary school construction workConstruction work for school buildingsWorkshops construction workBuilding construction work
Dokumenti & iesniegšana
AI kopsavilkums
Piesakieties, lai iegūtu AI kopsavilkumuContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Saistītie iepirkumi
Írország – Elemi iskola építése – Extension to St. Clare's National School Ballyjamesduff
BT-500-St. Clare's National School BallyjamesduffĪrijaPrimary school construction workTermiņš pēc 18 dienasPublicēts 2026. g. 02. aug.
Írország – Iskolaépületek kivitelezése – Remedial Works to section of roof
St. Michael's National School (Borris)ĪrijaConstruction work for school buildingsTermiņš pēc 25 dienasPublicēts 2026. g. 02. aug.
Írország – Elemi iskola építése – Two Storey Extension with SEN Base to Esker ETNS Lucan with Associated Siteworks and temporary accommodation
Esker ETNSĪrijaPrimary school construction workTermiņš pēc 36 dienasPublicēts 2026. g. 02. aug.
Írország – Elemi iskola építése – Fenor National School (Co. Waterford)
Fenor National SchoolĪrijaPrimary school construction workConstruction work for school buildingsBuilding extension workTermiņš pēc 25 dienasPublicēts 2026. g. 02. aug.