Dánia – Be- és kirakodógépek – Procurement procedure for a new Fly Ash Separation System to Waste-to-Energy Plant in Hjørring
Apraksts
Nordværk I/S is Denmark’s third-largest waste management company employing approximately 600 employees. Nordværk I/S is owned by seven municipalities in Northern Jutland: Aalborg, Hjørring, Brønderslev, Jammerbugt, Rebild, Mariagerfjord and Læsø. Nordværk I/S’ activities include – among other things – waste collection, the operation of recycling centers, landfills and environmental facilities as well as the handling of hazardous waste, clinical risk waste and pathological waste. Nordværk I/S also owns the company Nordværk Affaldsenergi, which operates waste-to-energy plants in Aalborg and Hjørring. In accordance with the current environmental permit of Nordværk Affaldsenergi’s Waste-to-Energy Plant in Hjørring, Nordværk Affaldsenergi is obliged to install a Fly Ash Separation System. The scope of the procurement procedure is to conclude a contract with a contractor to carry out the design, manufacturing, supply, erection, commissioning, testing and takeover including the responsibilities in the defects notification period of a new Fly Ash Separation System to Nordværk Affaldsenergi’s Waste-to-Energy Plant in Hjørring in order to fulfill the conditions in the environmental permit (hereafter referred to as “the Contract”). The scope of the Contract is further described in the tender material, in particular the document “Technical Specification”.
CPV kodi
Dokumenti & iesniegšana
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Saistītie iepirkumi
Dánia – Emelő- és szállítóberendezések és alkatrészeik – Maabjerg Energy Center' udbud vedr. udskiftning af affaldskran
Maabjerg Energy Center - Bioheat & Power A/SDānijaLifting and handling equipment and partsElectricity distribution and control apparatusInsulated wire and cableNav norādīts termiņšPublicēts 2026. g. 24. aug.
Dánia – Hozzáférés-ellenőrző rendszerek – Udbud på levering og installation af ADK-system
Nordværk I/SDānijaAccess control systemAccess platformsTermiņš pēc 25 dienasPublicēts 2026. g. 20. aug.
Dánia – Szennyvízkezelő gépek – EU-udbud vedr. etablering af MABR (Membrane Aerated Biofilm Reactor) anlæg på NØ Renseanlæg til VandCenter Syd A/S
SAMAQUA A/SDānijaMachinery for the treatment of sewageSewage treatment worksWastewater treatment plant construction workTermiņš pēc 43 dienasPublicēts 2026. g. 20. aug.
Dánia – Csapok, szelepek, csőszerelvények és hasonló elemek – Procurement of monoflange valves for Køge, Herning and Frøslev - 26/12038
Energinet Gastransmission A/SDānijaTaps, cocks, valves and similar appliancesValves defined by functionParts of taps and valvesTermiņš pēc 21 dienasPublicēts 2026. g. 17. aug.