Iet uz saturu
Atpakaļ uz meklēšanu

Īrija – Celtniecības darbi – Trinity Research Labs Deep Retrofit, Energy Efficiency and Decarbonisation and Fit Out Works

Trinity College Dublin the University of Dublin_336ĪrijaPublicēts 2026. g. 04. maijs
Nav norādīts termiņš

Apraksts

Proposed Works will provide the fit out of the existing buildings to provide sustainable, world class research facilities with improved accessibility and inclusivity. The Project will include significant fabric and service upgrade works to Units 1, 2, 3 and 8 as well as fit-out works to Units 2, 3 and 8. Unit 1 is currently under construction as an Aerospace research facility, Unit 2 is proposed to be repurposed as a world class Water Suite, Unit 3 is proposed to be a Human Research Facility with flexible and adaptable spaces, Unit 8, which is located at that level, will be repurposed into a Data Analysis and Modelling Lab and made accessible by provision of a lift.

CPV kodi

Construction work

Dokumenti & iesniegšana

AI kopsavilkums
Piesakieties, lai iegūtu AI kopsavilkumu

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Saistītie iepirkumi