Ireland – Bridge construction work – Galway City Council Bridge Remediation Salmon Weir Bridge
Apraksts
The scope of the proposed remedial works is summarised briefly as follows: • Site set-up; • Installation of water quality protection measures; • Traffic management; • Site clearance including vegetation clearance from embankments adjacent to the bridge; • Removal of all vegetation and algae from stonework faces; • Graffiti removal; • Cleaning of stonework (specialist mild abrasive blast system appropriate to protected structures); • Masonry Repairs (high quality sympathetic repairs by historic structure specialist mason); • Masonry Repointing of Joints (by historic structures specialist); • Repair of existing concrete scour aprons; • Parapet Balusters (in-situ repairs, surface prep and repainting); • Replacement of Heritage Lamp Standards and Lantern Heads; • Electrical works associated with Heritage Lighting; • Breakout of existing footpaths and construction of new footpaths; • Planing out existing road pavement and undertaking road pavement inlay; • Provision of new parapet architectural striplighting and associated electrical works; • Surface preparation and maintenance painting of existing watermain running along the southern elevation of the bridge. Galway City Council reserves the right to add additional contracts to this competition over the next few years 4 years with the an estimate spend of €2.5m.
CPV kodi
Dokumenti & iesniegšana
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Saistītie iepirkumi
Ireland – Construction work – 22 Heatherview Close, Dublin D24 WKD0.
Cheeverstown HouseĪrijaConstruction workTermiņš pēc 17 dienasPublicēts 2026. g. 19. nov.
Ireland – Refurbishment of run-down buildings – Refurbishment and Adaptive Re-use of West Gate House and Drogheda Youth Development Building
Louth County Council_381ĪrijaRefurbishment of run-down buildingsBuilding construction workBuildings of particular historical or architectural interestNav norādīts termiņšPublicēts 2026. g. 19. nov.
Ireland – Footpath construction work – Erris Looped Walks, Corclough Village, Mullet Peninsula, Co. Mayo
Údarás Na Gaeltachta_289ĪrijaFootpath construction workBoardwalk construction workPedestrian ways construction workTermiņš pēc 45 dienasPublicēts 2026. g. 19. nov.
Ireland – Engineering works and construction works – FIRE REMEDIAL AND REINSTATEMENT WORKS AT MARYMOUNT UNIVERSITY HOSPITAL AND HOSPICE
Marymount University Hospital and HospiceĪrijaEngineering works and construction worksTermiņš pēc 31 dienasPublicēts 2026. g. 19. nov.