Vjaġġa lill-kontenut
Regħa għall-ftit

North Macedonia – Pipeline-inspection services – Inspection of the natural gas transmission system Zhidilovo–Skopje and distribution pipeline Skopje South using the in-line method, and inspection of Deve Bair–Zhidilovo (0–4 km) and distribution pipelines Skopje North 1.8 km, Bunardzhik 5.4 km, Kumanovo 7.7 km, Kratovo 4.6 km and Kriva Palanka 1.5 km using NDT methods

Joint Stock Company for performing energy activity natural gas transmission NOMAGAS Skopje in state ownershipil-Maċedonja ta’ FuqNpubblikat fi 25 Ott 2026
27 ajam left

Deskrizzjoni

Services for inspection of the natural gas transmission system Zhidilovo–Skopje and the distribution pipeline Skopje South using in-line inspection (ILI), as well as inspection of the Deve Bair–Zhidilovo section (0–4 km) and the distribution pipelines Skopje North (1.8 km), Bunardzhik (5.4 km), Kumanovo (7.7 km), Kratovo (4.6 km) and Kriva Palanka (1.5 km) using non-destructive testing (NDT) methods, in accordance with the technical specification in the tender documentation.

Kodi CPV

Pipeline-inspection services

Dokumenti & sottomissjoni

Riżumat tal-Intelligenza Artifiċjali
Iġib il-ħdan għal riżumat tal-Intelligenza Artifiċjali

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Offerti relatati