Germany – Uninterruptible power supplies – CPS and UPS systems for SFRS and NUSTAR
Deskrizzjoni
The required CPS and UPS modules, as well as the external battery modules, serve as power supply systems. They are installed in 19"-racks. These racks are located along the beamline of the Super-FRS (Superconducting Fragment Separator), either directly at the beamline or in niches. The Super-FRS is part of the FAIR accelerator facility (Facility for Antiproton and Ion Research), which is currently under construction in Darmstadt, Germany. At their operating location, the systems are therefore exposed to increased radiation levels and are difficult to access. Since the components connected to the racks (e.g., detectors and electronics) are sensitive to random power fluctuations and interruptions, the CPS (Clean Power Supply) modules are intended to provide possible interference-free power, while the UPS (Uninterruptable Power Supply) modules, combined with battery units, are used to maintain the power supply in the event of a power failure.
Kodi CPV
Dokumenti & sottomissjoni
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Offerti relatati
Deutschland – Elektrische Maschinen, Geräte, Ausstattung und Verbrauchsartikel; Beleuchtung – Lieferung LED-Straßenleuchten, Typ Friedrichstadt
Land Berlin, Senatsverwaltung für Mobilität, Verkehr, Klimaschutz und Umweltil-ĠermanjaElectrical machinery, apparatus, equipment and consumables; lightingLamps and light fittingsRoad lightsDeadline fi 35 ajamIppubblikat f'28 Set 2026
Deutschland – Linearbeschleuniger – Linearbeschleuniger inkl. Vollwartungsvertrag für die ersten 5 Jahre
Universitätsklinikum Aachen AöRil-ĠermanjaLinear acceleratorsDeadline fi 30 ajamIppubblikat f'28 Set 2026
Deutschland – Notstromaggregat – Mobile 60 kVA Netzersatzanlagen
Institut der Feuerwehr NRWil-ĠermanjaEmergency generatorEmergency power suppliesDeadline fi 23 ajamIppubblikat f'28 Set 2026
Germany – Particle accelerators – Design, Manufacture, Supply and Installation of the Liquid Nitrogen (LN2) Transfer Line System for the Super-FRS Experiment Area
FAIR - Facility for Antiproton and Ion Research in Europe GmbHil-ĠermanjaParticle acceleratorsDeadline fi 30 ajamIppubblikat f'28 Set 2026