Terug naar zoeken
Írország – Középiskola építése – Contractor for Additional Accommodation Reconfiguration and In-Fill Works to provide 1x Art Room, 1x Woodwork room and preparation area to Presentation Secondary School, Ballyphehane, Cork.
Presentation Secondary School (Ballyphehane)IerlandGepubliceerd op 02 aug 2026
21 dagen overBeschrijving
The proposed development consists of Reconfiguration Works to provide •1 No. Conversion of Existing Home Economics Room in to Art Room (96.5m²), •1 No. Conversion of Existing Art Room in to Wood Technology Room (99.5m²), •In-Fill construction providing a Wood Machining and Preparation Room of 30m² area. The proposed reconfiguration layouts make the maximum use of the existing available space within the existing classrooms and the additional in-fill Wood Machining and Preparation Room slots within the existing footprint of the building.
CPV-codes
Secondary school construction workConstruction work for school buildingsWorkshops construction workBuilding construction work
Documenten & inzending
AI samenvatting
Meld je aan voor een AI samenvattingContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Vergelijkbare aanbestedingen
Írország – Elemi iskola építése – Extension to St. Clare's National School Ballyjamesduff
BT-500-St. Clare's National School BallyjamesduffIerlandPrimary school construction workVervaldatum over 18 dagenGepubliceerd op 02 aug 2026
Írország – Iskolaépületek kivitelezése – Remedial Works to section of roof
St. Michael's National School (Borris)IerlandConstruction work for school buildingsVervaldatum over 25 dagenGepubliceerd op 02 aug 2026
Írország – Elemi iskola építése – Two Storey Extension with SEN Base to Esker ETNS Lucan with Associated Siteworks and temporary accommodation
Esker ETNSIerlandPrimary school construction workVervaldatum over 36 dagenGepubliceerd op 02 aug 2026
Írország – Elemi iskola építése – Fenor National School (Co. Waterford)
Fenor National SchoolIerlandPrimary school construction workConstruction work for school buildingsBuilding extension workVervaldatum over 25 dagenGepubliceerd op 02 aug 2026