Lot 8 - Regenwater installations, locations A and B, Technical equipment Machine equipment, electrical, measuring, control and regulation technology for structures of the rainwater installations at 3 locations in or at the planned industrial area consisting of:

Rainwater settling basin A

2 units pumps with stainless steel piping

Fittings for basin emptying DN 80

1 unit clear water extraction pump with stainless steel piping and fittings DN 80

Connection to low voltage grid

Outdoor cabinet with power supply, pump control and protective measures for TT grid

Measuring technology for rainwater settling basin and connection to process control system

Lighting with 1 unit lighting mast, spotlights and control

Supply and laying of power and data cables in the contractor-provided empty pipe

Rainwater retention basin A

Stainless steel piping approx. 15 m DN 300 with 2 units fittings for basin emptying DN 300

Electrically controlled throttle valve DN 200 with actuator

Inductive flow meter DN 200

Connection to low voltage grid

Outdoor cabinet with power supply, slide control and protective measures for TT grid

Measuring technology for rainwater retention basin and connection to process control system

Lighting with 6 units lighting mast, spotlights and control

Supply and laying of power and data cables in the contractor-provided empty pipe

Rainwater retention basin B and rainwater settling basin B

Stainless steel piping approx. 10 m DN 400 with fittings for basin emptying

Electrically controlled throttle valve DN 400 with actuator

Inductive flow meter DN 400

Stainless steel piping approx. 10 m DN 200 with fittings for emergency basin emptying

2 units pumps with stainless steel piping

Fittings for basin emptying DN 80/DN 100

Connection to low voltage grid

Outdoor cabinet with power supply, pump and slide control and protective measures for TT grid

Measuring technology for rainwater retention basin and connection to process control system

Lighting with 5 units lighting mast, spotlights and control

Supply and laying of power and data cables in the contractor-provided empty pipe

CPV-codes

Construction work

Documenten & inzending

AI samenvatting
Meld je aan voor een AI samenvatting

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Vergelijkbare aanbestedingen