Szwajcaria – Instalowanie centralnego ogrzewania – Wärmeverbund Zumikon Ersatz Wärmeerzeugung
Opis
Heating centre or main supply of the district heating network of the municipality of Zumikon is located in the school building Juch. The district heating network is operated by 2 fossil fuel boilers (2x 750kW) and a water/water heat pump with a capacity of 550 kW (Total 2’050 kW). The heat pump is owned by Energie 360°. This also operates and maintains the heat pump. The system mix of a fossil fuel heating with a heat pump results in high return temperatures in the system during the transition and summer periods, which can damage the heat pump. During the winter period, the network functions correctly and results in an acceptable return temperature of approximately +45°C according to the feedback from Energie 360°. Energie 360° has not made any adjustments to the network except for an adjustment to the regulation in the school building Juch (Syspo). The high return temperatures of the district heating network are due to the lack of communication between the individual substations. The regulations, circulation pumps and heat meters in the individual substations (total 8) are outdated and in need of renovation. The reading of all heat meters in the substations is done manually and cannot currently be read at the control level. With the current tender, the replacement of the heat generation or the renewal of the equipment for [for the properties A, B, D, E, G, H and J is being sought. The Centre Café and the Community Centre are excluded from the planning perimeter as a renovation project for these properties is pending.
Kody CPV
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Powiązane zamówienia
Schweiz – Beschlagarbeiten – Mittenza für Muttenz – Kulturhaus Umnutzung und Sanierung I BKP 275 Schliessanlagen
Gemeinde MuttenzSzwajcariaIronmongery workAccess control systemLocks, keys and hingesTermin za 38 dniOpublikowano 12 lis 2026
Schweiz – Bauarbeiten – 740.00 Schanfiggerstrasse, Ableitung Deponie Egga (Valmischein)
Tiefbauamt GraubündenSzwajcariaConstruction workTermin za 19 dniOpublikowano 12 lis 2026
Suisse – Travaux de construction – CFC 211.5 Maçonnerie-BA
Commune de Grolley-PonthauxSzwajcariaConstruction workTermin za 36 dniOpublikowano 12 lis 2026
Suisse – Travaux de fouille et de terrassement – CFC 201 Terrassement
Commune de GrolleySzwajcariaExcavating and earthmoving workTermin za 36 dniOpublikowano 12 lis 2026