Powrót do wyszukiwania
Ta oferta została wycofana.
Irlandia – Roboty budowlane w zakresie kładzenia rurociągów – 26-011 Ballymore Eustace to Saggart Reservoir Resilience Project
Uisce ÉireannIrlandiaOpublikowano 17 cze 2026
Brak terminuOpis
The Contracting Entity intends to undertake a competitive tendering process, the objective of which is to appoint suitable Works Contractor to deliver the Ballymore Eustace to Saggart Reservoir Resilience Project. Full details are contained in the attached procurement documents.
Kody CPV
Pipelaying construction workConstruction workGeneral construction work for pipelinesConstruction work for water and sewage pipelinesAncillary works for water pipelinesWorks related to water-distribution pipelinesConstruction work for water projectsTunnelling worksPipes and fittingsEngineering design servicesEngineering design services for the construction of civil engineering worksPipeline-design servicesMechanical and electrical engineering servicesGeotechnical engineering services
Dokumenty i przesyłka
Podsumowanie AI
Zaloguj się, aby uzyskać podsumowanie AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Powiązane zamówienia
Írország – Mérnöki és építési munkák – MetroLink, Dublin – M120 Heavy Civils Enabling Works Framework Agreement
Transport Infrastructure Ireland (TII)IrlandiaEngineering works and construction worksTraversing bridgeSite preparation workBrak terminuOpublikowano 20 lip 2026
Írország – Lakóházak építése – TEN2600141 - CfT for Construction of 44 Units at Lios na Ri, Cootehill, Co. Cavan for Cavan County Council
Cavan County CouncilIrlandiaHouses construction workMulti-dwelling buildings construction workConstruction work for multi-dwelling buildings and individual housesTermin za 29 dniOpublikowano 20 lip 2026
Írország – Szennyvízszivattyú-állomás építése – Supply, Install and Commission of Surface Water Pumping Station and Ancillary Works (MEICA)
Office of Public Works (OPW)IrlandiaSewage pumping stations construction workWastewater pumping stationDredging and pumping worksTermin za 27 dniOpublikowano 20 lip 2026
Írország – Építési munkák – 9163 Single Supplier Framework Agreement for Design and Build Civil and Structural Contractor for DART+
Iarnród Eireann-Irish RailIrlandiaConstruction workSite preparation workBuilding demolition and wrecking work and earthmoving workBrak terminuOpublikowano 20 lip 2026