Powrót do wyszukiwania
Ireland – Site preparation work – Ground Penetrating Radar Survey at Abbey Bridge
Limerick City and County Council_103432IrlandiaOpublikowano 15 lis 2026
18 dni pozostałoOpis
The primary objective of the GPR Survey is to produce a duct layout of the post tensioned main span of the bridge. It is expected the entire bridge deck will be scanned from the top.
Kody CPV
Site preparation workStructures of bridgesSurvey conduction servicesSurvey analysis services
Dokumenty i przesyłka
Podsumowanie AI
Zaloguj się, aby uzyskać podsumowanie AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Powiązane zamówienia
Ireland – Construction work – New Military Equipment Store, Locker Block and Ablution Facility, Stephens Barracks, Kilkenny
Department of DefenceIrlandiaConstruction workEngineering works and construction worksConstruction work for military buildings and installationsBrak terminuOpublikowano 15 lis 2026
Ireland – Construction work – Multi Party Framework Agreement for Minor Repair and Maintenance Works to occupied properties owned or managed by Dublin City Council
Dublin City CouncilIrlandiaConstruction workTermin za 18 dniOpublikowano 15 lis 2026
Ireland – Road-surface painting work – Dynamic Purchasing System for Road Markings
Local Government Operational Procurement Centre (LGOPC)IrlandiaRoad-surface painting workParking-lot-surface painting workRoad-maintenance worksBrak terminuOpublikowano 12 lis 2026
Ireland – Refurbishment work – Shandon Exchange Project
Cork City CouncilIrlandiaRefurbishment workRefurbishment of run-down buildingsOverhaul and refurbishment workTermin za 31 dniOpublikowano 12 lis 2026